Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CTS Exam Prep Questions and Answers 100% Pass

Beoordeling
-
Verkocht
-
Pagina's
44
Cijfer
A+
Geüpload op
14-10-2023
Geschreven in
2023/2024

What are the four teams that comprise the overall Project Team? Owner, Design, Installation, and Management Who would belong to the Design team? Anyone with Consultant in their title except the moving consultant Which groups make up the Management Team? Developer, Construction Manager, and Building Management Agency The End-User, Facility Manager and Building Committee comprise which team within the Project Team? Owner Which group represent the generic roles that are important to the Project process? Project Managers, Designers and Installers

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

CTS Exam Prep Questions and Answers
100% Pass
What are the four teams that comprise the overall Project Team? ✔✔Owner, Design, Installation,

and Management




Who would belong to the Design team? ✔✔Anyone with Consultant in their title except the

moving consultant




Which groups make up the Management Team? ✔✔Developer, Construction Manager, and

Building Management Agency




The End-User, Facility Manager and Building Committee comprise which team within the

Project Team? ✔✔Owner




Which group represent the generic roles that are important to the Project process? ✔✔Project

Managers, Designers and Installers

,Which project characteristics must be considered in order to determine which method is best

suited for a particular project? ✔✔Schedule, Size, Type, Complexity, and Procurement

Requirements




What is an important aspect of funding that has a direct impact on the project process and

design/installation? ✔✔Technical Support Funding




Whether a construction project is large or small, which milestones must be achieved in a typical

schedule? ✔✔Programming, Building Design, AV Bid, and Move-In




What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for?

✔✔Long term projects with extended project cycles




What is the risk in using an OFE/Integrator Installed contract structure? ✔✔System and

infrastructure design and facility functionality may suffer




What are some of the important project scope and size considerations in selecting an AV

provider? ✔✔Financial Stability, Current Workload, and Company Credentials

,What type of document typically includes Project Size Requirements, Corporate Profile, Team

Personnel, and Warranty Response Time? ✔✔RFQ




a significant difference between the Two-Envelope Bid


Method and the Qualifications- Based Selection Method? ✔✔Negotiate with the highest ranking

firm to finalize the contract




What is one of the disadvantages of contracting the AV integrator to the electrical


subcontractor? ✔✔More layers of responsibility and communication




When conducting a complete project bid process, what milestone follows the issuing of the RFP?

✔✔Pre-Bid Meeting




Under what circumstances would you likely use an A305-1986 form? ✔✔Scoring responses to

an RFQ




What is the ideal way to contract an AV integrator? ✔✔Directly to the Owner

, The process of identifying the activities that end-users need to perform, and developing the

functional descriptions of your systems is referred to as:? ✔✔Needs Analysis




What is the main task of the third Step of the Program Phase of a Project? ✔✔Conducting

program meetings




What should be included in the written Program Report? ✔✔...A conceptual and functional

system description




The more accurate means to estimate dimensions of a commercial space during a site inspection

would be to? ✔✔Count Ceiling Tiles in a drop tile instalation




A client requires a new boardroom. The sales person and engineer are sent to the premises to

measure the facility and talk to the client. At this stage they should be performing a _ ✔✔Needs

Analysis




Sightlines for audience viewing in a given presentation space can be improved by: ✔✔Providing

a sloped, or stepped, seating arrangement

Geschreven voor

Vak

Documentinformatie

Geüpload op
14 oktober 2023
Aantal pagina's
44
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$17.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
eustacemaina122

Maak kennis met de verkoper

Seller avatar
eustacemaina122 USIU
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
3 jaar
Aantal volgers
1
Documenten
519
Laatst verkocht
1 jaar geleden

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen