Master Electrician PREP TEST Q&A VERIFIED
Master Electrician PREP TEST Q&A VERIFIED In a farm building where livestock is housed and an equipotential plane system is required because wire mesh or other conductive elements are embedded or placed under concrete and bonded to metal structures that could become energized, the equipotential plane is necessary to minimize _____ differences within the plane. - ANSWER voltage When exceptions are not to be considered, the MINIMUM voltage allowed at the line terminals of a 480-volt, three-phase, fire pump controller under motor starting conditions shall be ___. - ANSWER 408 volts For either overhead or underground primary distribution systems exceeding 1,000 volts on private property, the service disconnecting means shall be _____. - ANSWER permitted to be located in a location that is not readily accessible All 125-volt, 15- and 20-ampere rated receptacles located within NOT more than _____ of the inside walls of a storable swimming pool or hot tub shall be protected by a ground-fault circuit interrupter. - ANSWER 20 feet Given: A single rigid metal conduit (RMC) contains only the following three (3) circuits on the load side of the service overcurrent protection devices: * two (2) 150-ampere, three-phase circuits* one (1) 300-ampere, single-phase circuitThe load side equipment bonding jumper for this conduit must be a MINIMUM size _____ copper. - ANSWER 4 AWG Determine the conductor ampacity given the following related information: • ambient temperature of 44ºC• 250 kcmil THWN copper conductors• four (4) currentcarrying conductors in the raceway• length of raceway is 30 feet - ANSWER 167 amperes When exceptions are not applicable, the MINIMUM size common copper grounding electrode conductor for a separately derived alternating current electrical system with three (3) paralleled sets of size 300 kcmil copper secondary conductors shall be _____. - ANSWER 3/0 AWG
Geschreven voor
- Instelling
- Master Electrician
- Vak
- Master Electrician
Documentinformatie
- Geüpload op
- 20 oktober 2023
- Aantal pagina's
- 3
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
master electrician
-
master electrician prep test qa verified
Ook beschikbaar in voordeelbundel