2023/2024
The lean ratio of an extension ladder
4:1
According to AHERA, to complete a response action of a non-NESHAP size
project, how many samples must be taken with results of what?
5 samples taken inside with results of each <0.0 f/cc
What are the notification requirements in Virginia?
20 calendar days for any project greater than 10 sq feet or linear feet
In what jurisdiction do individuals need an asbestos supervisor or working
linsense
Need a license everywhere
Type of bond that would ensure that the general contractor will compensate
subcontractors for labor and materials
Performance Bond
Minimum respiratory protection on a class 1 asbestos project with no NEA
Full face air purifying respirator
What is the maximum content permitted in the work area where an air purifying
respirator is being worn?
23.5%
Chest XRays must be evaluated by what class reader?
Class B
What is the APF for a full face air purifying respirator
50
Friable ACM is any material that can be:
Crushed, pulverized, reduced to powder by hand pressure when dry
The OSHA permissible exposure limit is
0.1 f/cc over 8 hours TWA
According to ASHERA, how many air samples must be taken for final clearance
for NESHAP size project?
13 samples (5 inside, 5 outside, 2 fields blanks , one sealed blank)TEM
Laboratories that perform PLM and TEM must be accredited by
National Voluntary Laboratory Accreditation Program
AHERA is for
Public schools K-12
What is the notification requirement for asbestos projects in DC
10 working days prior to start NESHAP size projects and any project over 18 square
feet of flooring. Building owner to notify tenants no less than 30 days prior to start of the
project in writing
What is a NESHAP sized project
160 square feet, 260 linear feet, or 35 cubic feet
The competent person must inspect the work suits of the crew at least:
Once a shift
In Maryland, the asbestos project notification must be posted when and where?