NERC RC Exam with complete solutions 2023

Institution
Course

Content preview

NERC RC Exam with complete solutions 2023


Common standard time period for station battery to handle outage of AC power to chargers -
(correct answer)8-12 hours

Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed
unsuccessful - (correct answer)2 hours

Transition period to backup control facility (fully functioning) - (correct answer)2 hours

Annual testing of backup control facility must prove to be functional for this long - (correct answer)2
hours

Every 2 years TO/TOP/DSP must provide how many hours of system restoration training to field
switching personnel - (correct answer)2 hours

Every 2 years GOP's with blackstart resources shall provide how many hours of training to operating
personnel responsible for startup - (correct answer)2 hours

BAL-002 default contingency reserve restoration period (following disturbance recovery period) -
(correct answer)90 minutes

How often should BA calculate and record inadvertent interchange - (correct answer)60
minutes/hourly

How often should BA provide MW-hour meter readings to adjacent BA's - (correct answer)60
minutes/hourly

TLR procedure (identifying TLR level and actions to be implemented) needs updating how often -
(correct answer)60 minutes/hourly

Hourly ATC for next 48 hours calculated how often - (correct answer)60 minutes/hourly

During EEA2/3 the energy deficient entity needs to update the RC how often until alert is terminated
- (correct answer)60 minutes/hourly

DOE-417 (disturbance reporting) should be completed by when - (correct answer)60 minutes

BA with loss of resources must submit RFI with start time no more than how far beyond the resource
loss - (correct answer)60 minutes

Sink BA should ensure interchange modifications are submitted how soon after the modification -
(correct answer)60 minutes

If unable to calculate ACE for this long, BA must notify RC - (correct answer)30 minutes

ACE cannot exceed BAAL for how long - (correct answer)30 minutes

If AVR, PSS, or other voltage control device status changes from normal operation, GOP must notify
TOP within how long of the change (if it does not last longer than this, no reporting necessary) -
(correct answer)30 minutes

GOP must notify TOP of change in reactive capability how quick - (correct answer)30 minutes

TOP should return from unknown operating state how quick - (correct answer)30 minutes

IROL Tv should be less than or equal to... (system should be returned to IROL within this time frame
of exceeding) - (correct answer)30 minutes

, NERC RC Exam with complete solutions 2023


RC completes RT assessments of SOL/IROL violations how often - (correct answer)30 minutes

Once BA/TOP notifies RC of emergency conditions, RC has how long to notify other BA/TOP's and
neighboring RC's - (correct answer)30 minutes

Unplanned evacuation from BES control center facility is reportable by BA/TOP/RC if it lasts longer
than... - (correct answer)30 minutes

Complete loss of communication (including backup) is reportable if it lasts longer than... - (correct
answer)30 minutes

Planned or unplanned telemetering & control equipment outages of more than how many minutes
but be reported - (correct answer)30 minutes

Default ramp rate for Western Interconnection interchange schedules - (correct answer)20 minutes

When BA unable to calculate ACE > 30 minutes, they have how long to report to RC - (correct
answer)15 minutes

Default disturbance recovery period (time to return ACE to 0 following a disturbance, DCS) - (correct
answer)15 minutes

Congestion management requests in Eastern Interconnection from one RC to another must be
implemented how quickly - (correct answer)15 minutes

Voltage deviation of >/= 10% nominal is reportable after how long - (correct answer)15 minutes

Uncontrollable loss of firm load for how long is reportable (previous years peak demand >3000;
>/+300mw - otherwise 200mw) - (correct answer)15 minutes

Transmission & generator data including status, output capability, output, phase angle settings, avr
status, etc. should be updated every how many minutes - (correct answer)10 minutes

If BA denies interchange, they have how long to notify RC - (correct answer)10 minutes

Default ramp rate for for Eastern Interconnection interchange schedules - (correct answer)10
minutes

Unscheduled flow transmission relief requested by the TOP should be approved by the RC how
quickly - (correct answer)5 minutes

Ramp for interchange schedules starts how soon before start of schedule - (correct answer)5
minutes

Multiple contingencies within how many minutes of each other are reported as a single contingency
- (correct answer)1 minute

MW reportable threshold for sudden loss of gen - (correct answer)2000mw

Ace calculation occurs how often - (correct answer)6 seconds

When EEA3 is terminated, the EDE should submit a report to the RC how soon after
termination/downgrading - (correct answer)2 business days

How often is ATC for next 31 days calculated - (correct answer)24 hours/daily

Written for

Course

Document information

Uploaded on
October 21, 2023
Number of pages
8
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
sharpminds676

Get to know the seller

Seller avatar
sharpminds676 uon
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
2 year
Number of followers
0
Documents
21
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions