Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Nyc high pressure boiler license| 359 questions| with complete solutions| verified.

Beoordeling
-
Verkocht
-
Pagina's
33
Cijfer
A+
Geüpload op
25-10-2023
Geschreven in
2023/2024

Nyc high pressure boiler license| 359 questions| with complete solutions| verified.

Instelling
Vak

Voorbeeld van de inhoud

Nyc high pressure boiler license| 359
questions| with complete solutions|
verified.
The minimum blowdown for a spring loaded safety valve shall be
of what percent of set pressure? - -10%

-How is the main steam pressure gages tested? - -With an
inspectors gage

-Who is in charge of the code for any plumbing installations? - -
The nyc plumbing code

-When will anchorage or guides be inspected? - -Annually

-How many brass washout plugs does a miniature boiler have? - -
3 brass washout plugs, 1" in size

-How often is HP piping expansion joints inspected? - -Weekly

-How long should a hydronic system be pressure tested for? - -2
hours at no less than 100 psig

-How is a gage protected from excessive pressure? - -Shut off
cock

-Who is authorized to witness a test on a gas piping system? - -
Plumbing inspector, architect, licensed PE, master plumber,
agency by the DOB

-How should a remote disconnect be labeled? - -Remote control
for burner

,-When is a fusible plug not needed to be installed on a boiler? - -
Over 200 psig

-When shall a power boiler with a MAWP over 400 be tested? - -
Pressure tested annually

-What shall a design plan of a boiler and application contain but
not limited to? - -Size, location, operating pressure + temperature
of the pressure vessel and type + specs of PRV

-Who is responsible for maintaining the copies of the certified
welder qualifications report? - -The welding agency and shall be
available to the DOB

-Who needs to furnish a control diagram and boiler operation
instructions? - -The installer

-Who will certify and calibrate all gages utilized for testing? - -A
testing operator

-What shall be placed in between different joints and piping
material? - -An approved adapter fitting

-What items are exempt from the reporting requirements? - -The
seal welds of the tubes and the installation of back rings to man
holes and hand holes to boilers

-Who will be under control for any welding done to a high
pressure tank? - -An engineer supervising a welding inspection
agency acceptable to the DOB

-At what pressure is it requires to have extra heavy valves
installed? - -100 psig

,-The ______ files an application for a boiler alteration? - -Inspector

-How many safety valves does a boiler have with over 500
square feet of heating surface? - -2

-Gas fired boilers not exceeding 100 square feet of heating
surface shall be provided with a? - -Single or double cone type of
hood diverter in the stack

-A heater for either liquid fuels or other liquids harmful to the
boiler shall not be installed? - -Directly in the steam or water
space within the boiler

-Who is responsible for any spatial relationship between tanks
and gas services? - -The installer of the last installation to correct
a violation

-Who is responsible for the setting of operating and safety
controls? - -The Installing Company

-With what safety fitting shall you protect high pressure steam
and water boilers with? - -Dual low water cut outs

-Spring loaded safety valves have a total combined relieve
capacity of? - -100% of the max designed capacity of the boiler

-What is the total combined relieving capacity of power actuated
relieving valves? - -No less the 10% of the MAWP or no higher
then 20% above the MAWP

-What is the minimum blowdown for a spring loaded safety
valve? - -2%

, -When a boiler is derated what changes? - -The MAWP decreases
and the BTU output

-In hydronic piping systems where shall a shutoff valve be
installed? - -Before and after the Pressure Reducing Valve

-Hydronic piping joints between steel tubing and fittings shall be?
- -Mechanical or Welded

-What appears on the plate of a boiler? - -Serial #, name of
manufacturer, serial # of manufacturer, MAWP, heating surface,
year built and rated steam capacity

-Waste removal of a boiler shall conduct the products of
combustion where? - -To the atmosphere

-When a quick closing valve creates water hammer what is
installed on the line? - -A water hammer adapter is installed

-Safety valve capacity may be checked in what 3 ways? - -
Accumulation test, evaporative capacity of feed water and
amount of fuel burned

-Records of inspects are kept where? - -On the premises

-No joint anchorages or guides shall be repaired, replaced or
relocated without a work permit issued by the department. This
shall not apply to the repacking of a ___ or ___ joint. - -Ball or slip
joint

-Internal high pressure inspection requires the boiler to be ____,
___, ___, and ___. - -Shutdown, drained, removal of hand and man
holes

Geschreven voor

Vak

Documentinformatie

Geüpload op
25 oktober 2023
Aantal pagina's
33
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
NurseSallyD UNITED STATES
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
40
Lid sinds
3 jaar
Aantal volgers
35
Documenten
1104
Laatst verkocht
9 maanden geleden

4.9

7 beoordelingen

5
6
4
1
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen