ANSWERS
DBIA - ANSWER--Design Build Institute of America
Alternative Project Delivery - ANSWER--Any project delivery method
that is not design-bid-build.
What are examples of alternative project delivery methods? - ANSWER-
-Design-build and CM-at-risk
What does BIM stand for? - ANSWER--Building Information Modeling
BIMStorm - ANSWER--an online OPS (ONUMA Planning System)
collaboration
Best Value - ANSWER--a procurement approach that considers both
quantitative and qualitative or technical factors when selecting the
design-build team
Change Order - ANSWER--The way in which work can be added or
removed from the original scope of work agreed upon in the contract.
In typical delivery systems these changes will alter the original
estimate and schedule
, DBIA FINAL EXAM (2023 ACTUAL) QUESTIONS AND
ANSWERS
CM-at-Risk - ANSWER--performed by contractors who can offer pre-
construction services
CAD - ANSWER--Computer Aided Drafting
Conceptual Estimate - ANSWER--system-based estimating that utilizes
parametric formulas to determine project costs when design is less
than 100% complete
Contingency - ANSWER--an amount of money added to an estimate to
account for various unknown factors at the time the estimate is
initially developed.
Cost Model - ANSWER--A framework for identifying and quantifying all
project costs relative to a conceptual design in a systematic fashion
Design-Build - ANSWER--A project delivery method in which design
and construction services are provided under a single contract using a
team approach to deliver
Design-Bid-Build - ANSWER--A project delivery method in which the
owner holds and is responsible for managing two separate contracts
for design and construction