Maryland Asbestos exam | latest Actual questions and answers | updated
The lean ratio of an extension ladder -ANS- 4:1 According to AHERA, to complete a response action of a non-NESHAP size project, how many samples must be taken with results of what? -ANS- 5 samples taken inside with results of each 0.0 f/cc What are the notification requirements in Virginia? -ANS- 20 calendar days for any project greater than 10 sq feet or linear feet In what jurisdiction do individuals need an asbestos supervisor or working linsense -ANS- Need a license everywhere Type of bond that would ensure that the general contractor will compensate subcontractors for labor and materials -ANS- Performance Bond Minimum respiratory protection on a class 1 asbestos project with no NEA -ANS- Full face air purifying respirator What is the maximum content permitted in the work area where an air purifying respirator is being worn? -ANS- 23.5% Chest XRays must be evaluated by what class reader? -ANS- Class B What is the APF for a full face air purifying respirator -ANS- 50 Friable ACM is any material that can be: -ANS- Crushed, pulverized, reduced to powder by hand pressure when dry The OSHA permissible exposure limit is -ANS- 0.1 f/cc over 8 hours TWA
Geschreven voor
- Instelling
- Maryland Asbestos
- Vak
- Maryland Asbestos
Documentinformatie
- Geüpload op
- 1 november 2023
- Aantal pagina's
- 11
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
according to ahera to complete a response action
-
what are the notification requirements in virginia
-
in what jurisdiction do individuals need an asbest