VERIFIED 100% CORRECT!!
Which of the following is an alarm management output system?
A. Patient monitoring system
B. Bed monitoring system
C. Security system
D. Wireless telephone system
D. Wireless telephone system
The ________ system is an application used for storing and viewing captured
digital radiology image files.
A. CCU
B. ICU
C. DICOM
D. PACS
D. PACS
Which of the following is used to create an electronic signal that can be sent to
the central nurse call equipment?
A. Headend module
B. Initiation device
C. Notification device
D. Two tone device
B. Initiation device
You are designing an interactive patient television system (IPTS) that will provide
internet, nurse call and LCD television services. From the following, which
medium will NOT support these services in a backbone cabling system?
A. Balanced twisted pair
B. Coaxial 1/2 inch hard-line cable
C. Multimode optical fiber cable
D. RG-11 coaxial cable
A. Balanced twisted pair
How much area of wall space is needed in the telecommunications room (TR) to
support a nurse call system?
A. 1.2m x 1.2 m (4 ft x 4 ft)
B. 1.2m x 2.4 m (4 ft x 8 ft)
C. 2.4 m x 2.4 m (8 ft x 8 ft)
D. 2.4 m x 3.6 m (8 ft x 12 ft)
B. 1.2m x 2.4 m (4 ft x 8 ft)
You are designing a nurse call system for a health care facility. The system will
have emergency call switches. What is the first step you should take in designing
, the nurse call system?
A. Properly size the supporting TR to accommodate the headend system
B. Program the headend device for the various call switches that will be used
C. Perform a risk assessment to determine call switch locations
D. Perform a site survey to verify the pathways that will connect the headend
device with the call switches
C. Perform a risk assessment to determine call switch locations
You are renovating telecommunication rooms that support an acute care facility
that has10,000 sq ft floors. The facility will be adding 15,000 sq ft to each of the
floors. What is theMINIMUM additional floor space that you will need to expand
the TRs to support the new floor space?
A. 3 m x 3 m (10 ft x 10 ft)
B. 3.5 m x 4.3 m (11.5 ft x 14 ft)
C. 3.0 m x 4.5 m (10 ft x 15 ft)
D. 6 m x 6 m (20 ft x 20 ft)
B. 3.5 m x 4.3 m (11.5 ft x 14 ft)
You are designing a nurse call system for an assisted care facility. What type of
nurse call system would best suit the needs for the facility?
A. Audiovisual system -
B. Staff emergency system -
C. Tone/Visual system -
D. Bedside system -
C. Tone/Visual system -
Coupling with electrical circuits can create inductive interference to
telecommunications facilities. Which of the following can decrease the coupling
effect?
A. Decrease the exposure length
B. Make sure that the single-phase components add in phase
C. Decrease the physical separation
D. Increase the earth resistance
A. Decrease the exposure length
What is the air change requirement for a tunnel of 610 m (2000 ft) long with a
diameter of3.4 m (11 ft)?
A. One complete air change per hour
B. Two complete air changes per hour
C. Three complete air changes per hour
D. Four complete air changes per hour
E. Five complete air changes per hour
C. Three complete air changes per hour
A telephone facility and an electrical facility are required in a tunnel. To reduce
the effects of EMI and eliminate the need for additional shielding of the cables,