What are the 5 main stages of DB Leadership? - ANSWER-1. Project
team formation and alignment.
2. Project pursuit and procurement.
3. Design integration and advancement.
4. Construction.
5. Closeout and Commissioning.
_____ must manage the entire process - ANSWER-Design-Builders
What does IDWP stand for? - ANSWER-Integrated Design Work Plan
Which phase commitments sets the stage for Integrated Project
Leadership and Design-Build Process Control? - ANSWER-Proposal
Phase Commitments
The Construction process is _____ while the design process is ______. -
ANSWER-- sequential
- iterative
_____ problem solving is what creates the opportunity to optimize the
project. - ANSWER-Integrated
Create and _____ a culture for success - ANSWER-Sustain
,DBIA EXAM 2 LATEST 2023-2024 ACTUAL EXAM 200
QUESTIONS AND CORRECT DETAILED ANSWERS
WITH RATIONALES (VERIFIED ANSWERS) |ALREADY
GRADED A+
_____ _____ _______ create a shared vision of project success. -
ANSWER-Team Alignment Sessions
Commitment to Project goals promotes team _____ and _____. -
ANSWER-- integration
- cohesion
Proximity leads to _____ -- the power of overhearing. - ANSWER-
communication
Communication leads to __________ -- promotes common knowledge. -
ANSWER-understanding
Understanding leads to _____ -- interdisciplinary fluency develops One
Team. - ANSWER-respect
_____ fosters cohesion -- one team acts as one team - ANSWER-
Respect
Joint execution planning drives early _____-_____. - ANSWER-
decision-making
, DBIA EXAM 2 LATEST 2023-2024 ACTUAL EXAM 200
QUESTIONS AND CORRECT DETAILED ANSWERS
WITH RATIONALES (VERIFIED ANSWERS) |ALREADY
GRADED A+
What are the 4 DB Team Integration roles? - ANSWER-1. Integrated
Project Leader (DB - PM).
2. Designer of Record (A/E).
3. Design Manager.
4. Estimator (A/E).
Who leads the project team and manages team dynamics?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - ANSWER-a) Integrated Project Leader
Who balances the Owner's needs plus design and construction?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - ANSWER-a) Integrated Project Leader
Who is licensed to protect the health, safety and welfare of the public?