2023-2024) RATED A+
The regulations to enforce compliance of underground storage tank systems in the state are
found in?
a.) Code of Federal Regulations, 40 CFR Part 281
b.) California Code of Regulations, Title 23, Chapter 16
c.) Code of Federal Regulations, 40 CFR Part 280
d.) California Code of Regulations, Title 23, Chapter 17 - correct answers ✅b.) California Code of
Regulations; Title 23, Chapter 16
By definition an "underground storage tank system" includes
a.) The tank, all connected piping and dispensers
b.) The tank, all connected piping, ancillary equipment and containment system
c.) Only the tank
d.) Only tanks totally beneath the surface of the ground - correct answers ✅b.) The tank, all
connected piping, ancillary equipment and containment system
(H&SC, Sec 25281(z))
Under-dispenser containment was required for all UST systems by ___________.
a.) December 31, 2003
b.) July 1, 1987
c.) January 1, 1984
d.) January 1, 2000 - correct answers ✅a.) December 31, 2003
CCR Title 23, Sec 2636(g)(C)
P a g e 1 | 61
,According to California Law, UST systems installed after July 1, 2003, require a one-time ELD test
to ensure that the tank is product tight...
a.) If the tank is located within one (1) mile of a public drinking water well
b.) If the tank is located within 1000 feet of a public drinking water well
c.) Unless the tank is equipped with secondary containment
d.) In all cases - correct answers ✅For ALL tanks before use (H&SC 25290.2 (I))
d.) In all cases
H&SC, Sec 25290.2(i)
The written report submitted to the local agency after an unauthorized release is required to
include the following except:
a.) Description of actions taken to stop the release
b.) Cause of the release
c.) Method of disposal of released product
d.) Date on which the release was discovered - correct answers ✅b.) Cause of the release
CCR Title 23, Sec 2652(c)
An unauthorized release which does not escape from secondary containment only requires a
record on the operator's monitoring reports provided:
A. It did not increase the hazard of fire
B. It did not cause any deterioration of the secondary containment
C. It was cleaned up within 8 hours of detection
D. All of the above - correct answers ✅D. All of the above
P a g e 2 | 61
,H&SC, Sec 25294
The annual monitoring certification may be performed by:
A. A person possessing the appropriate contractors licenses
B. An individual trained and certified by the manufacturer of the monitoring equipment
C. A designated UST operator
D. A person who meets the requirements of both a and b - correct answers ✅D. A person who
meets the requirements of both a and b
CCR Title 23, Sec 2715(i)
The following is true of secondary containment testing, EXCEPT:
a.) Must be tested every 24 months
b.) Must be tested every 36 months
c.) Results must be submitted to the local agency within 30 days of testing
d.) Local agency must be notified 48 hours prior to testing - correct answers ✅a.) Must be
tested every 24 months
CCR Title 23, Sec 2637(a)
Records of cathodic protection system maintenance must be kept on file for ______________.
a.) 10 years
b.) 1.5 years
c.) 3 years
d.) 6.5 years - correct answers ✅d.) 6.5 years
P a g e 3 | 61
, CCR Title 23, Sec 2712(b)
Impressed current cathodic protection systems shall be inspected no less than every
___________ to ensure that they are in proper working order:
a.) 60 days
b.) 90 days
c.) 30 days
d.) 120 days - correct answers ✅a.) 60 days
CCR Title 23, Sec 2635(a)(2)
Monthly monitoring data must be kept on file for _________________.
a.) 3 years
b.) 6.5 years
c.) 5 years
d.) For the life of the UST system - correct answers ✅a.) 3 years
CCR Title 23, Sec 2712(b)
By December 22, 1998, all automatic line leak detectors installed on single-walled pressurized
piping must be capable of:
a.) Restricting product flow
b.) Triggering an audible and visual alarm
c.) Shutting down the pumping system
d.) Shutting off the flow at the dispenser - correct answers ✅c.) Shutting down the pumping
system
P a g e 4 | 61