Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Summary

Summary of MAC and FAC chapters for CAB6 exam

Rating
3.5
(2)
Sold
4
Pages
17
Uploaded on
02-01-2024
Written in
2023/2024

This summary covers the content of MAC and FAC for the CAB6 exam.

Institution
Course

Content preview

MAC chapter 3

There are three kinds of inventory for manufacturing companies:

1. Raw materials → Materials used to make a product.
2. Work-in-process → Goods that are in manufacturing process but not complete.
3. Finished goods → Completed goods not yet sold.

Direct and indirect costs:

• Direct cost → Can be easily and cost-effectively traced to a cost object.
- Cost object is anything for which managers want a separate measurement of cost.
• Indirect cost → Cannot be easily or cost-effectively traced directly to a cost object.

Manufacturing costs are:

• Direct materials → Raw materials used in production.
• Direct labor → Labor of employees working on the products.
• Manufacturing overhead → Indirect product costs associated with production, including:
- Indirect materials
- Indirect labor
- Factory costs for rent, utilities, insurance, etc.

Prime and conversion costs:

• Prime costs → Combine the direct costs of direct materials and direct labor (DM + DL).
• Conversion costs → Combine direct labor with manufacturing overhead (DL + MOH).

Period and product costs:

• Period costs → Non-manufacturing costs:
- Selling expenses
- Administrative expenses
- Expensed when incurred
• Product costs → Manufacturing costs:
- Direct materials
- Direct labor
- Manufacturing overhead
- Recorded first as an asset, expensed when sold

Objective 3.1: Describe the flow of costs through a process costing system

Job order costing system → Accounting system that accumulates costs by job. Used by companies that manufacture
unique products or provide specialized services.

Process costing system → Accounting system that accumulates costs by process. Used by companies that manufacture
identical units through a series of uniform production steps or processes. Two methods are:

1. Weighted-average
2. First-in, first-out (FIFO)

,Production costs accumulate during each process, and a company assigns these costs to the products passing through
that process. Costs per unit of each process are used to:

1. Control costs → Look for ways to cut costs when actual production costs are more than planned costs.
2. Set sales prices → Sales price has to cover the costs of making the product, the selling and administrative costs,
as well as earn a profit.
3. Calculate account balances → Ending balances are needed in WIP and FG inventory for the balance sheet and
COGS for the income statement.

Objective 3.2: Calculate equivalent units of production for direct materials and conversion costs

Companies may have products still in process at the end of the accounting period. The total production costs incurred in
each process must be split between the following:

1. The units that have been completed in that process and transferred to the next process (A)
2. The units not completed and remaining in WIP inventory (B)

Unit cost of completed units is more than the unit cost of the incomplete units. Equivalent units of production (EUP):

• Used to measure the direct materials, direct labor, and MOH incurred on partially completed units and expressed
in terms of fully completed units.
• Conversion costs → Cost to convert direct materials into finished goods: DL + MOH.
• The equivalent units of production can be different for direct materials and conversion costs and, therefore, must
be calculated separately.
• For some partially completed products, the direct material costs may already be 100% incurred → product is
complete from the perspective of material costs.

Objective 3.3: Prepare a production cost report for the first department using the weighted-average method

Production cost report → Report prepared by a processing department for equivalent units of production, production
costs, and the assignment of those costs to the completed and in process units. The four steps are:

1. Summarize flow of physical units (Units to account for)
- Physical units are the actual units that the company will account for during the period
2. Compute output in terms of equivalent units of production (Units accounted for)
- Separately for DM and conversion costs
3. Compute cost per equivalent unit of production (Costs to account for)
- Weighted-average method → Combines the beginning work-in-process costs and the costs added during the
period into one cost pool (accumulation of individual costs)
4. Assign costs to units completed and units in process (Costs accounted for)
- Multiplying cost per equivalent unit of production x equivalent units of production

Two unique terms are used on the production cost report:

• To account for → Includes the amount in process at the beginning of the period plus the amount started or added
during the period.
• Accounted for → Shows what happened to the amounts to account for. They are either still in process B or
completed A and transferred out. Transferred out + In process

, MAC chapter 8

Goal 1: Prepare flexible budgets and performance reports using static and flexible budgets

A budget variance is the difference between an actual amount and a budgeted amount. Companies use budgets to specify
how much they expect different parts of the firm’s operations to cost. Budget performance reports can then be constructed
afterwards by comparing the budget with the actual outcome.

Static budget → A budget prepared for only one level of sales volume.

Budget performance report → Report that summarizes actual results, budgeted amounts, and differences.

Variance → Difference between an actual amount and the budgeted amount:

- Favorable → If actual amount increases operating income
- Unfavorable → If actual amount decreases operating income

Static budget variance → Difference between actual results and the expected results in the static budget.

Static budget performance report is useful to:

1. Evaluate manager’s effectiveness when actual level of sales closely approximates budgeted amount.
2. Evaluate manager’s ability to control fixed manufacturing costs and fixed selling and administrative expenses.
Not helpful in evaluating variable costs.

Flexible budget → A budget prepared for various levels of sales volume. The flexible budget generally means the budget
constructed at the actual level of sales. Useful because:

1. They show operating income at several different levels of activity
2. They help to isolate how variable costs change based on different levels of activity

Categories of the static budget variance:

1. Flexible budget variance → Difference between the actual results and the expected results in the flexible
budget for the actual units sold. Variance because company has different revenues and/or costs than expected
for the actual units sold.
2. Sales volume variance → Volume difference between actual sales and budgeted sales.

Written for

Institution
Study
Course

Document information

Uploaded on
January 2, 2024
Number of pages
17
Written in
2023/2024
Type
SUMMARY

Subjects

$7.62
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Reviews from verified buyers

Showing all 2 reviews
1 year ago

1 year ago

3.5

2 reviews

5
0
4
1
3
1
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
RD09 Hanzehogeschool Groningen
Follow You need to be logged in order to follow users or courses
Sold
304
Member since
5 year
Number of followers
128
Documents
19
Last sold
1 day ago

4.0

39 reviews

5
10
4
21
3
6
2
1
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions