SAFe SPC Section 5 - Releasing on Demand with DevOps 100%correct
ART Sync - ANSWER coordinates progress during PI via Scrum of Scrums and PO Sync Scrum of Scrums - ANSWER Visibility in progress and impediments Facilitated by RTE Participants: SMs, selected team members, SMEs as needed Weekly or more - 30 - 60 minutes timeboxed and followed by meet after PO Sync - ANSWER Visibility into progress, scope, priority adjustments facilitated by RTE or PM Participants: PMs, PO, stakeholders and SMEs as needed weekly or more, 30 - 60 minutes timeboxed and followed by meet after DevOps in the value stream - ANSWER Value occurs only when the end users are operating the solution CALMR approach to DevOps - ANSWER "C"ulture of shared responsibility "A"utomation of CD pipeline "L"ean flow - small batch, limited WIP, visibility "M"easure the flow - use application telemetry "R"ecovery - architect and enable low risk releases Continuous Exploration - ANSWER Hypothesize Collaborate and Research Architect Synthesize Features - ANSWER have benefit hypothesis and acceptance criteria fit in 1 PI Functional and NonFunctional Requirements Epics - ANSWER have big hypothesis and can span PIs may contain multiple features Reinertsen on CoD - ANSWER "if you only quantify one thing, quantify the cost of delay" Cost of Delay calculation - ANSWER User-Business Value + Time Criticality + Risk Reduction & Opportunity enablement System Increment - ANSWER demo every 2 weeks Better testing - ANSWER "shift testing left" to close gap between implementation and validation and get fast continuous feedback Architect for releasability - ANSWER enablers build runway features consume runway continuously maintain runway allocate specific percent of capacity for enablers to extend runway Innovation and Planning Iteration - ANSWER innovation - opportunity for innovation, hackathons and infrastructure improvements planning- provides cadence based planning estimating - guard band for cadence based delivery Reinertsen on cadence - ANSWER "Provide sufficient capacity margin to enable cadence" Program Performance Report - ANSWER Assess PI Objectives for completeness and val
Written for
- Institution
- SAFe SPC Section 5
- Course
- SAFe SPC Section 5
Document information
- Uploaded on
- January 6, 2024
- Number of pages
- 2
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
safe spc section 5 releasing on demand with devo
-
safe spc section 5 stuvia
-
art sync answer coordinates progress during pi v
-
po sync answer visibility into progress scope
Also available in package deal