LEED AP O&M Practice Test Questions With Complete Solutions.
A project team is assessing existing luminaires for Light Pollution Reduction and found some fixtures emit light at a vertical angle more than 90 degrees from straight down. What statement is true regarding the project's ability to earn the credit? - The team must retrofit or replace the noncompliant fixtures to earn the credit An office building has six individual workstations, two private offices, and a conference room. What lighting control configuration would meet the requirements of EQ Credit Interior Lighting? - Individual lighting controls for four workstations and multizone control for the conference room. There are 8 individual occupant spaces, so any combination that equals 50% of the individual spaces would count as meeting the requirements. When occupancy data is entered into the indoor water use calculator, it is split by default to a 50/50 gender ratio. Under which circumstance should this be ratio changed? - A project can alter the default ratio if it is justified. Same-sex schools are one example. What frequency of recording data is required during the performance period for WE Credit Water Metering? - All meters, including whole-building meter, must be recorded at least weekly and used in a regular analysis of time trends Typical end uses for a commercial office building that may require advanced metering for EA Credit Advanced Energy Metering include all of the following except: - Projects must sub-meter all energy end uses that are at least 20% of the total building energy use excluding plug loads. A project team has an existing building commissioning plan resulting from the analysis of the building. What can this document serve as the foundation of? - The Ongoing Commissioning credit can use existing building commissioning plan to create the ongoing commissioning plan. A project team for an office building took daylight measurements in all regularly occupied spaces in the month of June. Which action must occur for the project to achieve Daylight Measurement for EQ Credit Daylight and Quality Views? - Two measurements must be taken for the option. How frequently should occupant surveys be performed to achieve IEQ Credit Occupant Comfort Survey? - Perform at least one survey and implement corrective actions. At a minimum, perform one new survey at least once every 2 years.As an alternative refrigerant to HCFC a project team is considering HFC-410A. What is the trade-off to when using HFC-410A in the HVAC&R system? - It has a lower GWP but require more energy to achieve the same level of cooling. Who should be included in the project team for SS Credit Site Improvement Plan? - Anyone having to do with the land should be involved with this credit as part of the integrated team: Landscape architect Hydrologist Civil engineer Restoration ecologist Landscape designers Maintenance staff Project teams should coordinate the solid waste management policy and the environmentally preferred purchasing policy in what areas? - Areas such as source reduction, contract agreements, communications with building occupants overlap between the two policies. A project team is inventorying the regularly occupied spaces of an office building occupied by one tenant. Under what circumstances could any of the regular occupied spaces be excluded from the requirements of daylighting? - When tasks would be hindered by the use of daylight This is the only exception allowed.
Written for
- Institution
- LEED AP O&M
- Course
- LEED AP O&M
Document information
- Uploaded on
- January 7, 2024
- Number of pages
- 44
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
leed ap om