When does the CGP apply? - ANSWER- Any construction or demolition of one acre or more Activities under the CGP include: A. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. B. Disturbances to land surfaces solely related to agricultural operations. C. Clearing and grading 2 acres of land D. Discharges of storm water from areas on tribal lands. - ANSWER- C Risk Level 2 monitoring requirements include: A. Effluent sampling where applicable B. Sampling for pH and turbidity C. Sampling for pH, turbidity, and suspended sediments - ANSWER- B All NAL data must be uploaded within ___ after NAL exceedance has been identified A. 24 hours B. 1 week C. 10 days C. 2 weeks - ANSWER- C Who must file Permit Registration Documents (PRDs) prior to the commencement of construction activity? A. Qualified SWPPP Developer (QSD) B. Legally Responsible Person (LRP) or the LRP's Approved Signatory C. Qualified SWPPP Practitioner (QSP) D. The CEO - ANSWER- B Which regulation establishes a framework for regulating municipal and industrial storm water discharges to waters of the United States: A. Clean Water Act (CWA) B. Porter-Cologne Water Quality Control Act C. Endangered Species Act D. U.S. Environmental Protection Agency (USEPA)

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

ATI RN MATERNAL NEWBORN WITH NGN
PROCTORED 2024 TEST BANK ACTUAL EXAM
WITH COMPLETE QUESTIONS ,CORRECT AND
VERIFIED ANSWERS ALREADY GRADED A+

When does the CGP apply? - ANSWER- Any construction or demolition of one acre or
more
Activities under the CGP include:
A. Routine maintenance to maintain original line and grade, hydraulic capacity, or
original purpose of the facility.
B. Disturbances to land surfaces solely related to agricultural operations.
C. Clearing and grading 2 acres of land
D. Discharges of storm water from areas on tribal lands. - ANSWER- C

Risk Level 2 monitoring requirements include:
A. Effluent sampling where applicable
B. Sampling for pH and turbidity
C. Sampling for pH, turbidity, and suspended sediments - ANSWER- B

All NAL data must be uploaded within ___ after NAL exceedance has been identified
A. 24 hours
B. 1 week
C. 10 days
C. 2 weeks - ANSWER- C

Who must file Permit Registration Documents (PRDs) prior to the commencement of
construction activity?
A. Qualified SWPPP Developer (QSD)
B. Legally Responsible Person (LRP) or the LRP's Approved Signatory
C. Qualified SWPPP Practitioner (QSP)
D. The CEO - ANSWER- B

Which regulation establishes a framework for regulating municipal and industrial storm
water discharges to waters of the United States:
A. Clean Water Act (CWA)
B. Porter-Cologne Water Quality Control Act
C. Endangered Species Act
D. U.S. Environmental Protection Agency (USEPA)
E. California Environmental Quality Act (CEQA) - ANSWER- A

,Certain non-storm water discharges may be necessary for the completion of
construction projects. Therefore the General Permit authorizes such discharges
provided they meet the following conditions except:
A. Meet the NALs for pH and turbidity
B. Not cause or contribute to a violation of water quality standards
C. Comply with BMPs as described in the SWPPP
D. Be infeasible to eliminate
E. Causes or threatens to cause pollution, contamination, or nuisance - ANSWER- E

When possible, use erosion controls as the ___ protection, with sediment controls as a
___system.
A. primary, secondary
B. secondary, primary - ANSWER- A

A temporary or permanent structural BMP that directs concentrated flows away from
disturbed areas and prevents erosion is...
A. erosion control
B. run on/ run off control
C. sediment control - ANSWER- B

The amount of eroded soil that settles out at a point in the watershed that is remote
from the origin of the detached soil particles is...
A. Rainfall Erosivity Factor
B. Slope Length and Steepness Factors
C. Soil Cover Factor
D. Sediment Yield - ANSWER- D

What is turbidity?
A. The degree to which the water loses its transparency due to the presence of
suspended particulates
B. the acidity or alkalinity of a solution
C. the degree to which a chemical substance or a particular mixture of substances can
damage an organism - ANSWER- A

The removal of a uniform thin layer of soil by raindrop splash or water run-off is...
A. Splash Erosion
B. Rill Erosion
C. Sheet Erosion
D. Wind Erosion - ANSWER- C

What elements of RUSLE are independent of location?
A. K
B. R
C. LS
D. C & P - ANSWER- D

, What does the "P" stand for in the Revised Universal Soil Loss Equation (RUSLE)?
A. Soil erodibility factor
B. Management operations and support practices (sediment controls)
C. Rainfall-runoff erosivity factor
D. Length-slope factor
E. Cover factor (erosion controls) - ANSWER- B

What is the difference of an LUP project in comparison to traditional projects?
A. Erosion control is not needed.
B. "Run-On/Run-Off" is not an objective.
C. Sampling is not required. - ANSWER- B
Stockpiles require a linear sediment barrier at all times, and must be covered prior to a
rain event or when inactive. A stockpile is inactive after __days of inactivity.
A. 3
B. 7
C. 10
D. 14 - ANSWER- D

Once identified, dischargers shall begin implementing repairs or design changes to
BMPs:
A. Immediately
B. Within24 hours
C. Within48 hours
D. ASAP, but not more than 72 hours - ANSWER- D

The discharger shall ensure a QSP develop a Rain Event Action Plan (REAP) __ hours
prior to any likely precipitation event.
A. Immediately
B. 24 hours
C. 48 hours
D. ASAP but not more than 72 hours - ANSWER- C

A likely precipitation event is any weather pattern that is forecasted to have a __% or
greater probability of producing precipitation in the project area.
a. 10
b. 25
c. 50
d. 75
e. 99 - ANSWER- C
TRUE OR FALSE: At Risk Level 2 & 3 sites, receiving water monitoring is required if the
receiving water monitoring trigger exceeded pH, turbidity and SSC. Bioassessment for
sites 30 acres or larger. - ANSWER- False (Risk level 3 only)
Visual monitoring is required for non-storm water, pre-rain and post-rain at what Risk
Levels?
a. Risk Level 1
b. Risk Level 2

Geschreven voor

Vak

Documentinformatie

Geüpload op
21 januari 2024
Aantal pagina's
19
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$22.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
bilhahmbanya3

Maak kennis met de verkoper

Seller avatar
bilhahmbanya3 Chamberlain College Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
2 jaar
Aantal volgers
0
Documenten
328
Laatst verkocht
10 maanden geleden

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen