/Complete Questions And Answers
Quiz :True/False
According to the NERC Functional Model, there is no difference between the
function and the entity.
A) True
B) False - Answer :B) False
Quiz :True/False
Analysis type questions are designed to be the least complex from a human
cognitive process.
A) True
B) False - Answer :B) False
Quiz :True/False
A Transmission Service Provider is an entity that both owns and operates
transmission facilities on the Bulk Electric System.
A) True
B) False - Answer :B) False
Quiz :True/False
The NERC Functional Model is designed so that the functions of Generator
Owner and Generator Operator can be performed by two different entities.
A) True
B) False - Answer :A) True
Quiz :How many forms of identification are required when taking the NERC
System Operator Certification exam?
A) 4
,B) 9
C) 1
D) 2 - Answer :2
Quiz :The NERC came into existence as a result of the Electric Power Reliability
Act of what year?
A) 1958
B) 2005
C) 1967
D) 1997 - Answer :1967
Quiz :How many certification credentials does NERC have examinations for?
A) 2
B) 4
C) 6
D) 3 - Answer :4
Quiz :Match the acronym with the appropriate organization.
FERC North American Electric Reliability Corp
NERC Florida Reliability Coordinating Council
FRCC Reliability First
RF Federal Energy Regulatory Commission - Answer :1. FERC Federal Energy
Regulatory Commission
2. NERC North American Electric Reliability Corporation
3. FRCC Florida Reliability Coordinating Council
4. RF Reliability First
Quiz :True/False
Balancing Authorities are responsible to ensure that transmission facilities are
operated within the limits that are established by the Transmission Owners. -
Answer :False
Quiz :The first power pool in the industry was created in 1927 and was known
as which of the following? - Answer :Pennsylvania-New Jersey Interconnection
, Quiz :How many Interconnections are there in North America?
A) 4
B) 6
C) 2
D) 8 - Answer :A) 4
Quiz :True/False
All four Interconnections operate at ____ Hz, but are not in synchronization
with each other.
A) 59Hz/False
B) 62Hz/True
C) 60HZ/True
D) 60.02Hz/False - Answer :C) 60Hz
Quiz :How many High-Voltage Direct Current transmission lines are there in
operation between the Western and ERCOT Interconnections?
A) 2
B) 0
C) 5
D) 3 - Answer :B) 0
Quiz :Match the Interconnection with the approximated size in MWs.
1. Eastern 78,000 MW
2. ERCOT 610,000 MW
3. Western 42,000 MW
4. Quebec 265,000 MW - Answer :1. Eastern 610,000 MW
2. ERCOT 78,000 MW
3. Western 265,000 MW
4. Quebec 42,000 MW
Quiz :In the early days of the electric power system, why weren't high voltage
transmission lines needed to serve the customer demand? - Answer :Because
the generation was built close to the customer load