MSSC CPT Maintenance Pre-Quiz Final Exercise Correctly Answered (RATED A+)
A chain should be replaced when its length becomes________ longer than the original length. - ANSWER 3% Daily maintenance involves daily records because - ANSWER recurring events can be analyzed to troubleshoot problems Prior to shutting down a machine for preventive maintenance, the operator MUST - ANSWER remove all the debris and any residue from the machine The best place for an operator to find information regarding the handling of all lubricants and safety precautions is in - ANSWER SDS If a company does follow-up work after a PM that is considered________ maintenance - ANSWER reactive It is important to have a ___________ to complete the PM work on a machine - ANSWER completion date When lubricating a bearing, the worst mistake to make would be_______ - ANSWER get dirt into the bearing Which of the following would be classified as an unplanned downtime maintenance activity________ - ANSWER reactive maintenance What is the goal of total productive maintenance ( TPM)? - ANSWER zero breakdowns and defects When a maintenance technician completes a scheduled PM
Written for
- Institution
- MSSC CPT
- Course
- MSSC CPT
Document information
- Uploaded on
- February 23, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
mssc cpt
-
mssc cpt maintenance pre quiz final exercise corre
-
a chain should be replaced when its length becomes
-
daily maintenance involves daily records because
Also available in package deal