Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SSM TEST REVIEW ACTUAL QUESTIONS AND ANSWERS 2024 GRADED A+

Beoordeling
-
Verkocht
-
Pagina's
7
Cijfer
A
Geüpload op
29-02-2024
Geschreven in
2023/2024

SSM TEST REVIEW ACTUAL QUESTIONS AND ANSWERS 2024 GRADED A+ What is the definition of soil and foundation work? Grading in soil or installing underpinning, Augering in soil or removing sheeting, Excavating and drilling in soil or rock When contractors use light duty two-point adjustable suspended scaffolds in NYC, what ¾'' grade #1 unspliced manila rope At what grade must power buggy brakes be capable of being fixed in engagement to hold a full load stationary? 25% grade The definition of _____________ is: a horizontal transverse scaffold member (which may be supported by legs or runners) upon which the scaffold platform rests and joins scaffold uprights, posts, poles, and similar members Bearer (putlog) The deck and the substantial enclosure of a sidewalk shed shall be extended parallel to the curb at least 20 feet beyond the building line when construction is_______ greater than 100 feet In structures undergoing demolition, how must the existing sprinkler system be maintained Non-automatic and Siamese hose connections shall be marked by a metal sign reading "Sprinkler Siamese Connection" and by a red-light bulb at night A ramp for a power buggy must be designed to support how many times the maximum intended live load 4 The permanent floors of skeleton steel construction shall be installed as soon as possible as steel installation progresses. In no case shall there be more than _________ or equivalent levels or __________,

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

SSM TEST REVIEW ACTUAL QUESTIONS AND
ANSWERS 2024 GRADED A+

What is the definition of soil and foundation work?
Grading in soil or installing underpinning, Augering in soil or removing sheeting,
Excavating and drilling in soil or rock
When contractors use light duty two-point adjustable suspended scaffolds in
NYC, what
¾'' grade #1 unspliced manila rope
At what grade must power buggy brakes be capable of being fixed in
engagement to hold a full load stationary?
25% grade
The definition of _____________ is: a horizontal transverse scaffold member
(which may be supported by legs or runners) upon which the scaffold platform
rests and joins scaffold uprights, posts, poles, and similar members
Bearer (putlog)
The deck and the substantial enclosure of a sidewalk shed shall be extended
parallel to the curb at least 20 feet beyond the building line when construction
is_______
greater than 100 feet
In structures undergoing demolition, how must the existing sprinkler system
be maintained
Non-automatic and Siamese hose connections shall be marked by a metal sign
reading "Sprinkler Siamese Connection" and by a red-light bulb at night
A ramp for a power buggy must be designed to support how many times the
maximum intended live load
4
The permanent floors of skeleton steel construction shall be installed as soon
as possible as steel installation progresses. In no case shall there be more
than _________ or equivalent levels or __________, whichever is less, between
the erection floor and the uppermost permanent floor.
8 stories, 120 feet
If an open excavation has been discontinued or interrupted for at least ___
months, the lot shall be filled and graded to eliminate all steep slopes, holes,
obstructions, or similar sources of hazard.
3
Excavated material and superimposed loads such as equipment, trucks, etc.,
shall not be placed closer to the edge of the excavation than a distance equal
__________ the depth of such excavation, unless the excavation is in rock or
unless the sides of the excavation have been sloped or sheet piled (or
sheeted) and shored to withstand the lateral force imposed by such
superimposed loads.
to one and one-half times
The Commissioner shall inquire into the cause of any accident involving
equipment. When an accident involves any piece of equipment on the site, no
person shall do the following without the permission of the Commissioner:
Use such equipment or remove the equipment or any part thereof from the area of
the job site

, According to 3314.8.2, the scaffold shall be enclosed with debris netting
consisting of a wire screen comprised of not less than _____ wire mesh, or
equivalent synthetic with a maximum _________ mesh.
No. 18 steel, one-half inch
According to NYC DOB, how many years is the 32-Hour Rigging Supervisor
Training valid for and how many hours is the required refresher course?
4 years and 16 hours
Specific to foundation operations that affect adjacent properties: The owner of
the property that may be affected shall be given ____ days written notice of the
intention to perform such operations.
10
According to Chapter 3301, any construction equipment that would affect
public safety must be inspected before use with the exception of
Hand tools
Who shall inspect construction equipment that might affect public safety
before it is used for a specific job at the construction site?
Competent person designated by the contractor
What are the four main suspended scaffolds inspections mandated by the NYC
Building Code (Chapter 33 Section 3314-scaffolds)?
Prior to installation, installation inspection, pre-shift, and after repair or adjustment.
Whenever the working deck reaches a height greater than ____ stories, at least
one elevator must be kept in readiness for the fire department?
7
If the top deck of the sidewalk shed is not built solidly against the face of the
structure in such a manner that no material can fall onto the sidewalk, what
must be done?
The side of the shed toward the structure shall be solidly sealed with wood or other
suitable material for the full height of the shed
Specific to regulations in NYC about erecting/removing wood pole scaffolds:
When a new working level is desired, the existing________ shall be left
undisturbed until the new working level is framed.
Planks
Sidewalk shed decks on buildings less than 100 feet in height may be
designed and constructed to carry live loads of how many pounds per square
foot?
. 150 lbs.
Construction fences must be at least ___ feet high and the new color
requirement is?
8/Hunter Green
Putlogs for single pole scaffolds shall be set with the greater dimension
vertical and shall be long enough to project beyond the outer edge of the poles
by at least ____ inches.
12
Viewing panels 12'' x 12'' shall be provided in solid construction fences at a
distance of one for every ____ feet.
25
Openings in construction fences, railings or sidewalk sheds for loading
purposes may be open only at certain times. Which of the following
statements is MOST accurate with regards to these openings?
Openings must be kept closed at all times except during actual loading operations

Geschreven voor

Vak

Documentinformatie

Geüpload op
29 februari 2024
Aantal pagina's
7
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
missyk2030
3.0
(2)

Maak kennis met de verkoper

Seller avatar
missyk2030 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
6
Lid sinds
2 jaar
Aantal volgers
5
Documenten
580
Laatst verkocht
1 jaar geleden
kioks

TIGHT DEADLINE? I CAN HELP Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3.0

2 beoordelingen

5
1
4
0
3
0
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen