Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

BECC MOD 1 TEST ACTUAL QUESTIONS AND ANSWERS 2024 GRADED A+

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
03-03-2024
Geschreven in
2023/2024

BECC MOD 1 TEST ACTUAL QUESTIONS AND ANSWERS 2024 GRADED A+ What ARE 3 considerations when dealing with electrical burns? Electrical current may burn a large area just below the surface Perform CPR if needed Treatment is the same as for a thermal burn (True/False) Section 300 of the PQS book list infrequent task and abnormal conditions. TRUE The overall purpose of PQS is to ...... provide a means to qualify ships personnel. (True/False) PQS provides an effective way to monitor an individual's qualification progress. TRUE When can your Final Qualification Page be signed?. After all line items have been completed and signed Vocabulary used in each qualification can be found in the ....... Section of the PQS book. FUNDAMENTALS Progress and completed qualifications of each person in the division are displayed on/in the ....... PROGRESS CHART Who is the final qualification authority? COMMANDING OFFICER A five inch outside micrometer will measure objects that are ....... inches thick. 4-5IN A Dial indicator may be used to....... ALIGN MACHINERY It is NOT safe to operate electrical power tools in areas where ....... is/are present. FLAMMABLE GASES Electrical power tools must be inspected prior to issue by a qualified ....... ELECTRICIAN A torque wrench is used to measure the tightness of ... FASTENERS Torque wrenches are considered ....... equipment PRECISION If a maintenance procedure does not specify a torque sequence, utilize the recommended sequence found in ....... NTM CHAPER 075 Which document contains maintenance requirements pertaining to all equipment in a command? PMS MASTER FILE 16. Which portion of the PMS Master File provides the work center supervisor a ready reference of planned maintenance requirements.? WORK CENTER PMS MANUAL If a planned maintenance action cannot be completed in accordance with the steps listed on the MRC, the maintenance man should ....... STOP AND REPORT TO THE WCS What is used to notify personnel that death or injury may result if the operating procedures and practices are NOT correctly followed? Warnings Which of the following serves as the "Table of Contents" for the Work Center PMS manual? LIST OF EFFECTIVE PAGES (LOEP) The SYSCOM Control Number assigned for each maintenance requirement listed in a MIP must match the number on the corresponding

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

BECC MOD 1 TEST ACTUAL QUESTIONS AND
ANSWERS 2024 GRADED A+

What ARE 3 considerations when dealing with electrical burns?
Electrical current may burn a large area just below the surface
Perform CPR if needed
Treatment is the same as for a thermal burn
(True/False) Section 300 of the PQS book list infrequent task and abnormal
conditions.
TRUE
The overall purpose of PQS is to ......
provide a means to qualify ships personnel.
(True/False) PQS provides an effective way to monitor an individual's
qualification progress.
TRUE
When can your Final Qualification Page be signed?.
After all line items have been completed and signed
Vocabulary used in each qualification can be found in the ....... Section of the
PQS book.
FUNDAMENTALS
Progress and completed qualifications of each person in the division are
displayed on/in the .......
PROGRESS CHART
Who is the final qualification authority?
COMMANDING OFFICER
A five inch outside micrometer will measure objects that are ....... inches thick.
4-5IN
A Dial indicator may be used to.......
ALIGN MACHINERY
It is NOT safe to operate electrical power tools in areas where ....... is/are
present.
FLAMMABLE GASES
Electrical power tools must be inspected prior to issue by a qualified .......
ELECTRICIAN
A torque wrench is used to measure the tightness of ...
FASTENERS
Torque wrenches are considered ....... equipment
PRECISION
If a maintenance procedure does not specify a torque sequence, utilize the
recommended sequence found in .......
NTM CHAPER 075
Which document contains maintenance requirements pertaining to all
equipment in a command?
PMS MASTER FILE
16. Which portion of the PMS Master File provides the work center supervisor
a ready reference of planned maintenance requirements.?
WORK CENTER PMS MANUAL

, If a planned maintenance action cannot be completed in accordance with the
steps listed on the MRC, the maintenance man should .......
STOP AND REPORT TO THE WCS
What is used to notify personnel that death or injury may result if the operating
procedures and practices are NOT correctly followed?
Warnings
Which of the following serves as the "Table of Contents" for the Work Center
PMS manual?
LIST OF EFFECTIVE PAGES (LOEP)
The SYSCOM Control Number assigned for each maintenance requirement
listed in a MIP must match the number on the corresponding
MRC (maintenance requirement card)
Materials needed to perform the required maintenance are found on the
FRONT OF THE MRC
The responsibility to replace a missing MRC belongs to the .......
WORK CENTER SUPERVISOR
Who assists the Department Head in managing maintenance at the division
level?
DIVISION OFFICER
Who has the responsibility to maintain the list of effective pages?
WORK CENTER SUPERVISOR
Which schedule is NOT used in the 3M system?
DAILY
Which of the following periodicity code is used when a maintenance
requirement is performed monthly?
M
Which document is use to verify that you have the proper MRC?
MIP (MAINTENANCE INDEX PAGE)
You must check the ...... to ensure that the weekly schedule is correct.
QUARTELY SCHEDULE
Material needed to perform a specific PMS action is listed on the ......
MRC (MAINTENANCE REQUIREMENT CARD)
The maintenance procedure steps on the MRC are
TO BE FOLLOWED PRECISELY
The shipboard hazardous material list is provided ...... on the Department of
Defense's CDROM.
QUARTERLY
Requirements for storage of hazardous material are found on the ......
MSDS
While grinding or chiseling, what should be used to protect the eyes?
CHIPPING GOGGLES
Which procedure does NOT require eye protection?
NORMAL OPERATION OF A LUBE OIL SYSTEM
Who is responsible for ensuring that PMS is performed on eyewash stations?
DIVISION OFFICER
Which of the following tags/labels prohibits operation of equipment that could
endanger personnel or equipment?
DANGER TAG
Maintenance aboard ship is the responsibility of the .......
SHIPS FORCE

Geschreven voor

Vak

Documentinformatie

Geüpload op
3 maart 2024
Aantal pagina's
5
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
missyk2030
3.0
(2)

Maak kennis met de verkoper

Seller avatar
missyk2030 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
6
Lid sinds
2 jaar
Aantal volgers
5
Documenten
580
Laatst verkocht
1 jaar geleden
kioks

TIGHT DEADLINE? I CAN HELP Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3.0

2 beoordelingen

5
1
4
0
3
0
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen