CDFM Module 4 Questions & Answers | with 100% Correct Answers | Verified | What is JCIDS (Joint Capabilities Integration and Development System)? assesses gaps in military joint warfighting capabilities and recommends solutions to resolve these gaps Defense Acquisition System Process by which DoD acquires weapon systems and automated information systems What document provides entry into Milestone A the the Defense Acquisition System? Materiel Development Decision What are the two steps in pre-systems acquisition? Materiel solution analysis and technology development Which milestone is the program initiation? Milestone B The MDA may authorize entry into the acquistion system at any point? True or False True What are the most expensive programs? ACAT IA Who is the single point of accountability for accomplishing program objectives? program manager What says the DOD may not obligate funds for a major defense acquisition program after the program enters the Engineering and Manufacting phase? 10 USC 2435 What is systems engineering? overarching process that a program team applies to transition from a stated capability need to an operationally suitable system. It is the integrating mechanism across the technical efforts Program managers prepare a _________ for each milestone review, beginning with Milestone A. Systems Engineering Plan (SEP) Integrated Product and Process Development (IPPD) is mgmt technique that simultaneously integrates all essential acquisition activities through the use of multidisciplinary teams to optimize design, manufacturing and supportability processes. What are the 3 levels of IPT's Overachring Integrated Product Team (OIPT) that oversees entire program, Integrateing Integrated Product Team (IIPT), and Working Level Integrated Product Team (WIPT) that advise the PM What are the 8 technical management processes? 1. Decision Analysis 2. Technical Planning 3. Technical Assessment 4. Requirements Management 5. Risk Management 6. Configuration Management 7. Data Management 8. Interface Management What is decision analysis?

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

CDFM Module 4 Questions & Answers | with 100%
Correct Answers | Verified |
What is JCIDS (Joint Capabilities Integration and Development System)?
assesses gaps in military joint warfighting capabilities and recommends solutions to
resolve these gaps
Defense Acquisition System
Process by which DoD acquires weapon systems and automated information systems
What document provides entry into Milestone A the the Defense Acquisition
System?
Materiel Development Decision
What are the two steps in pre-systems acquisition?
Materiel solution analysis and technology development
Which milestone is the program initiation?
Milestone B
The MDA may authorize entry into the acquistion system at any point? True or
False
True
What are the most expensive programs?
ACAT IA
Who is the single point of accountability for accomplishing program objectives?
program manager
What says the DOD may not obligate funds for a major defense acquisition
program after the program enters the Engineering and Manufacting phase?
10 USC 2435
What is systems engineering?
overarching process that a program team applies to transition from a stated capability
need to an operationally suitable system. It is the integrating mechanism across the
technical efforts
Program managers prepare a _________ for each milestone review, beginning
with Milestone A.
Systems Engineering Plan (SEP)
Integrated Product and Process Development (IPPD) is
mgmt technique that simultaneously integrates all essential acquisition activities through
the use of multidisciplinary teams to optimize design, manufacturing and supportability
processes.
What are the 3 levels of IPT's
Overachring Integrated Product Team (OIPT) that oversees entire program, Integrateing
Integrated Product Team (IIPT), and Working Level Integrated Product Team (WIPT)
that advise the PM
What are the 8 technical management processes?
1. Decision Analysis 2. Technical Planning 3. Technical Assessment 4. Requirements
Management 5. Risk Management 6. Configuration Management 7. Data Management
8. Interface Management
What is decision analysis?

, provide the basis for evaluating and selecting alternatives
SEP is a mandated tool for this activity
Technical planning
_______ measures technical progress and the effectiveness of plans and
requirements
technical assessment
What maintains the traceability of all requirements from needs?
requirements management
_________ is an audit trail of decisions and design modifications
configuration management
What answers the question of "did you build it right"?
verification
What answers "is this the right solution"?
validation
What is a system of system engineering?
satisfy capabilities thru multiple and interacting systems. Not to be confused with a
"family of systems"
What is the formal entry point into the acquisition process?
Material Solution Analysis Phase
What is not a decision point but opens the gate if all criteria has been met?
MDA
Which pases enters approved ICD and study guidance for conducting AOA and is
guided by ICD and AOA plan?
materiel solution analysis phase
Which phase reduces technology risks, determine and mature the appropriate set
of technologies to be integrated into a full system and to demonstrate critical
technologies on prototypes?
technology development phase
The MDA for an MDAP, without the authority to delegate, shall sign a certification
memorandum for record prio to ______________?
Milestone A
What follows the completion of technology development?
Milestone B decision
The purpose of the _____________ phase is to develop a system or an increment
of capability; complete full system integration; develop an affordable and
executable manufacturing process; ensure operational supportability with
particular attention to minimizing the logistics footprint
EMD (Engineering and Manufacturing Devlopment)
Prior to beginning the ____________, users shall identify and the requirements
authority shall approve a minimum set of key performance parameters (KPPs),
included in the CDD, that guides the efforts of this phase.
EMD
EMD begins at _______________?
Mileston B which is normally the initiation of an acquistion program

Geschreven voor

Vak

Documentinformatie

Geüpload op
5 maart 2024
Aantal pagina's
10
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EXAMSMART Howard Community College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
10
Lid sinds
2 jaar
Aantal volgers
2
Documenten
2997
Laatst verkocht
1 maand geleden
SMART.SCORES

On this page, you find all documents, package deals, and flashcards offered by seller LectJoshua.

5.0

2 beoordelingen

5
2
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen