NASCLA GC Exam REVIEW NOTES
precast floor panel jacking -: removed when grout has hardened
corbel -: used to support structural beams
concrete panels -: help with rapid construction
lift wall panels -: at edges
dunnage continuous -: only for one stack
value engineering -: only during design phase
superintendent -: is responsible for "as built" drawings
shop drawings -: fabricator or manufacturer
CPM -: start work at different times but finish at the same time
laydown -: area used to store materials
keep approved submittals -: on the job site
submittals -: impact schedule
addendum -: during bid/before contract
,change order -: after contract
owner is responsible -: for making sure site is ready to build
PM is unlikely to work with -: "as built" drawings
NFPA Pamphlet 72 -: audible requirements for smoke detectors
stair risers -: 4" min/7" max
ramps with rise greater than 6" must have -: handrail
grab bars in shower -: 33-36"
toilets 16-18" -: from side wall
grab bars -: support 250 lbs
24" back from center of washer door -: distance for wheelchair
door hardware btw/ -: 34 and 48"
door opening switch location -: outside arc of door
accessible route -: 36"
60" diameter -: turnaround for wheelchair
, max slope for any floor surface -: 1:48
van space width -: reduced 36"
height of elevator keypad -: 54"
minimum ramp landing length -: 60"
ramps with slopes over 1:20 -: require handrail
maximum vertical change in level ground -: 1/4"
airentraining agent -: prevents freeze-thaw damage
calcium chloride (accelerator) -: increases setup, used in cold weather
sugar (retarder) -: slows setup, used in heat
fiber tube forms -: require stiffeners
curing controls drying -: hydration is needed
never pour concrete on frozen ground -: below 40 is "cold weather concrete"
bull float -: knock down highs and lows
vibrator -: makes concrete more dense
precast floor panel jacking -: removed when grout has hardened
corbel -: used to support structural beams
concrete panels -: help with rapid construction
lift wall panels -: at edges
dunnage continuous -: only for one stack
value engineering -: only during design phase
superintendent -: is responsible for "as built" drawings
shop drawings -: fabricator or manufacturer
CPM -: start work at different times but finish at the same time
laydown -: area used to store materials
keep approved submittals -: on the job site
submittals -: impact schedule
addendum -: during bid/before contract
,change order -: after contract
owner is responsible -: for making sure site is ready to build
PM is unlikely to work with -: "as built" drawings
NFPA Pamphlet 72 -: audible requirements for smoke detectors
stair risers -: 4" min/7" max
ramps with rise greater than 6" must have -: handrail
grab bars in shower -: 33-36"
toilets 16-18" -: from side wall
grab bars -: support 250 lbs
24" back from center of washer door -: distance for wheelchair
door hardware btw/ -: 34 and 48"
door opening switch location -: outside arc of door
accessible route -: 36"
60" diameter -: turnaround for wheelchair
, max slope for any floor surface -: 1:48
van space width -: reduced 36"
height of elevator keypad -: 54"
minimum ramp landing length -: 60"
ramps with slopes over 1:20 -: require handrail
maximum vertical change in level ground -: 1/4"
airentraining agent -: prevents freeze-thaw damage
calcium chloride (accelerator) -: increases setup, used in cold weather
sugar (retarder) -: slows setup, used in heat
fiber tube forms -: require stiffeners
curing controls drying -: hydration is needed
never pour concrete on frozen ground -: below 40 is "cold weather concrete"
bull float -: knock down highs and lows
vibrator -: makes concrete more dense