Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Class A Operator UST questions and Answers 100% Correct

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
09-03-2024
Written in
2023/2024

Is this statement true or false? Fiberglass and flexible plastic piping do not need to have cathodic protection.False. Cathodic protectiona technique used to control the corrosion of a metal surface by making it the cathode of an electrochemical cell. A simple method of protection connects the metal to be protected to a more easily corroded "sacrificial metal" to act as the anode. Fill in the blank to make the statement correct. Owners and Operators must keep the most recent ___ records of cathodic protection testing.2 How long do owners and operators have to report a release to the implementing agency?24 Hours Fill in the blank if the tank was installed on or before April 11, 2016 manual tank gauging ALONE can be used on tanks containing ________ gallons and meeting certain diameter requirements?1000 gallons or less. True or False? Tanks from 1001 gallons to 2000 gallons and tanks from 551 and 1000 gallons that do not meet the specified diameters can temporarily use manual tank gauging when it is combined with tank tightness testing.True True or False? Under UST regulation combining manual tank testing and tank tightness testing can only be used for 10 years after the tank was installed and may not be used for any tanks installed after April 11 2016.True True or False? Manual tank gauging can be used to meet the release detection monitoring requirements for any size of tank.False True or False? Owners and operators may cancel a financial respo

Show more Read less
Institution
Course

Content preview

Class A Operator UST
questions
and Answers 100% Correct
Is this statement true or false? Fiberglass and flexible plastic piping do not need to have cathodic
protection.✔✔False.



Cathodic protection✔✔a technique used to control the corrosion of a metal surface by making it
the cathode of an electrochemical cell. A simple method of protection connects the metal to be
protected to a more easily corroded "sacrificial metal" to act as the anode.


Fill in the blank to make the statement correct. Owners and Operators must keep the most recent
___ records of cathodic protection testing.✔✔2



How long do owners and operators have to report a release to the implementing agency?✔✔24
Hours


Fill in the blank if the tank was installed on or before April 11, 2016 manual tank gauging
ALONE can be used on tanks containing ________ gallons and meeting certain diameter
requirements?✔✔1000 gallons or less.


True or False?
Tanks from 1001 gallons to 2000 gallons and tanks from 551 and 1000 gallons that do not meet
the specified diameters can temporarily use manual tank gauging when it is combined with tank
tightness testing.✔✔True


True or False?
Under UST regulation combining manual tank testing and tank tightness testing can only be used
for 10 years after the tank was installed and may not be used for any tanks installed after April 11
2016.✔✔True

, True or False?
Manual tank gauging can be used to meet the release detection monitoring requirements for any
size of tank.✔✔False


True or False?

Owners and operators may cancel a financial responsibility mechanism at any time.✔✔False


When can an owner or operator cancel a financial responsibility mechanism? Only when they
have obtained an alternative mechanism; the tank has been permanently closed or undergoes a
change in service; or if corrective action is required and completed.✔✔Only when they have
obtained an alternative mechanism; the tank has been permanently closed or undergoes a change
in service; or if corrective action is required and completed.


True or False?
Owners and operators do not need to maintain financial responsibility once the UST has been
permanently closed.✔✔True


True or false?

Septic tanks are regulated by the 40 CFR part 280.✔✔False


Owners and operators who switch from E10 to E15 have 30 days AFTER switching to notify the
implementing agency.✔✔False
They have 30 days BEFORE


Which of the following substances if stored in an
UST would cause the UST to be regulated under 40 CFR part 280? Choose all that apply:
-Gasoline with 10% ethanol
-Propane
-Diesel

Written for

Course

Document information

Uploaded on
March 9, 2024
Number of pages
11
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$8.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
calebby50

Get to know the seller

Seller avatar
calebby50 Arizona Western College
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
2 year
Number of followers
0
Documents
119
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions