CQM-C FINAL EXAM STUDY GUIDE
CQM-C FINAL EXAM STUDY GUIDE The purpose of Construction Quality Management is to: - CORRECT ANSWER-Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel. Construction Quality Management is the performance of tasks, which ensure that construction is performed. - CORRECT ANSWER-According to plans and specifications, on time, within a defined budget and a safe work environment. Partnering relationships are based upon: - CORRECT ANSWER-Building trust and dedication to common goals It is the responsibility of Quality Assurance Personnel to: - CORRECT ANSWERPeriodically verify that the contractors system of control is working effectively. An effective contractor quality control program will: - CORRECT ANSWER-Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits. The success or failure of all contractors is based upon: - CORRECT ANSWER-The ability to control costs, finance work, estimate jobs, schedule the work, and maintain effective quality control. Quality Assurance Personnel have the responsibility to: - CORRECT ANSWER-Require contractors to maintain the quality specified in the plans and specifications. Inspection is: - CORRECT ANSWER-The process by which ongoing and completed work is examined During the punch-out inspection of a project: - CORRECT ANSWER-Quality Assurance Personnel must assure that the contractor prepares a punch-list and makes corrections. If there is a disagreement whether the contractors work complies with the contract: - CORRECT ANSWER-The government makes the final determination Characteristics that describe a definable feature of work include: - CORRECT ANSWER-Cross-referenced listings to the contractors construction schedule that may have more than one definable feature under a section of the specifications. The _____________________ consists of daily checks of the work to assure continuing compliance with contract requirements. - CORRECT ANSWER-Follow-up phase
Written for
- Institution
- CQM-C
- Course
- CQM-C
Document information
- Uploaded on
- March 13, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cqm c final exam study guide
-
the purpose of construction quality management is
-
the quality control plan contains
-
grounds for withholding payment include the contra