NASCLA GC Exam (Questions and A nswers)
NASCLA GC Exam (Questions and A nswers) precast floor panel jacking - CORRECT ANSWER-removed when grout has hardened corbel - CORRECT ANSWER-used to support structural beams concrete panels - CORRECT ANSWER-help with rapid construction lift wall panels - CORRECT ANSWER-at edges dunnage continuous - CORRECT ANSWER-only for one stack value engineering - CORRECT ANSWER-only during design phase superintendent - CORRECT ANSWER-is responsible for "as built" drawings shop drawings - CORRECT ANSWER-fabricator or manufacturer CPM - CORRECT ANSWER-start work at different times but finish at the same time laydown - CORRECT ANSWER-area used to store materials keep approved submittals - CORRECT ANSWER-on the job site submittals - CORRECT ANSWER-impact schedule addendum - CORRECT ANSWER-during bid/before contract change order - CORRECT ANSWER-after contract owner is responsible - CORRECT ANSWER-for making sure site is ready to build PM is unlikely to work with - CORRECT ANSWER-"as built" drawings NFPA Pamphlet 72 - CORRECT ANSWER-audible requirements for smoke detectors stair risers - CORRECT ANSWER-4" min/7" max ramps with rise greater than 6" must have - CORRECT ANSWER-handrail
Geschreven voor
- Instelling
- NASCLA
- Vak
- NASCLA
Documentinformatie
- Geüpload op
- 13 maart 2024
- Aantal pagina's
- 13
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
control contraction
-
nascla gc exam questions and a nswers
-
precast floor panel jacking
-
24 back from center of washer door
Ook beschikbaar in voordeelbundel