Wood plates are being laid out so that the rough openings for the doors can be located. Anchor bolts
must be placed so that there is a bolt located within how many inches from the end of each section
plate?
12 inches
A contractor puts in a claim under a comprehensive standard general liability policy. The policy has no
additional coverage, riders, or floaters, and has a $1,000 deductible per occurrence. The claim is for a
job-site accident that caused $5,000 of injuries to employees, $1,000 of injuries to a pedestrian, $3,000
damage to the contractor's equipment, and $3,000 loss of project materials purchased by the
contractor. The insurance company is liable for
$0.00
What is the minimum temperature to be maintained during gypsum board finishing procedures?
50 degrees
For a concrete masonry wall to be solid, all units must have at least what percentage of its net area as
solid?
75%
Metal panels that are designed to act as stressed-skin panels are attached directly to the structural
frame of the building with
clips
Which phase of the value engineering process involves creating design concepts for the alternatives
identified in the evaluation phase?
development phase
Which is a true statement regarding the maximum construction load that can be placed on an
unbraced truss?
No load can be supported by an unbraced truss.
Which is true about compacting the sub-base in preparation for concrete placement?
The thinner the lift the better the compaction
Concrete is being placed during cold weather when the temperature is above 40 degrees. According to
the American Concrete Institute, if the concrete is heated, which is true about the effect on the
minimum curing time?
5 days is required at 50 degrees F