Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

INF3708 EXAM PACK 2023 DISTINCTION GUARANTEED

Beoordeling
-
Verkocht
-
Pagina's
12
Cijfer
A+
Geüpload op
18-03-2024
Geschreven in
2023/2024

INF3708 EXAM PACK 2023 - DISTINCTION GUARANTEED Software Project Management is less important in the era of modern software development since most projects are successful and completed on time: A task that has not started is assigned an ____ value of zero and when it has been completed, it , and the project is credited with the original ____ value of the task The Day-to-Day responsibility a project rest with the _______. Resources allocation is a step in project planning activities that comes immediately after ______ Which aspect of software project management places restriction on software developer to follow the requirements of human clients? Waterfall as a software development approach is: According to Hughes and Cotterell, (2009). A number of factors need to be taken into consideration when allocating individuals to tasks. Some of these factors include: In project management, cost-benefit analysis comprises of: One of the main strategy a project manager considers when drawing up plans to bring a project back on target is to shorten the critical path. Which of the following is not one of the ways to shorten a critical path? Brainstorming and checklist are two main approaches to _____? The basis of successful project management is: The first step in producing a resource allocation plan is to PBSs indicate: ______ Cost category ensures that projects are charged directly for use of resources. Which of the following is not true about the similarity between PERT and CPM networks: Which of the following is not one of the difficulties affecting software estimation efforts: _________ is the process of planning, leading, and controlling the efforts of organizational members and the use of other organizational resources in order to achieve stated organizational goals, simply implies a process of structured activities. _________ is the composition of Software Project Management scope where normally an outline plan is formulated for the entire project and detailed plans for each phase of the project as they are encountered. This may include, but are certainly not limited to, work- and product breakdown structures (for the entire project as well as per phase), quality standards, risk management and change control procedures, resource allocation, time management and costing calculations. The following statement best describe which aspect that is unique to a software project management as compared to general project management? "The ease with which software can be changed is seen as one of its strengths. Due to the fact that software is generally expected to conform to existing systems in an organization and not vice versa, software systems are likely to be subject to a high degree of change." Software Project Management is less important in the era of modern software development since most projects are successful and completed on time: The classical life cycle model of software development is: The linear sequential model of software development is also known as the: Evolutionary software process models: The rapid application development model is: The spiral model of software development: The basis of successful project management is: Stake holders are people who have an interest or stake in a project. Which of the following is true of stake holders? Strategic decisions regarding projects are: Which of the following is (are) true regarding project products? A payroll system is:

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

INF3708 Already Passed

1). Software project management is less important in the era of modern software development
since
most projects are successful and completed on time:

 Ans: False


2). A task that has not started is assigned an ____ value of zero and when it has been
completed, it , and the
project is credited with the original ____ value of the task

 Ans: Earned and Planned


3). The day-to-day responsibility a project rest with the _______.

 Ans: Project manager


4). Resources allocation is a step in project planning activities that comes immediately after
______

 Ans: Identifying activity risks.


5). Which aspect of software project management places restriction on software developer to
follow the
requirements of human clients?

 Ans: Conformity.


6). Waterfall as a software development approach is:

 Ans: The ideal approach where requirements are well defined and the development
methods are well
understood.


7). According to hughes and cotterell, (2009). a number of factors need to be taken into
consideration when
allocating individuals to tasks. some of these factors include:



PaperStoc.com Page 1 of 12

,  Ans: Team building, risk, and training.


8). In project management, cost-benefit analysis comprises of:

 Ans: Expressing cost and benefits in common units.Identifying all the costs and
benefits of carrying out the project and operating the delivered
application.


9). One of the main strategy a project manager considers when drawing up plans to bring a
project back on
target is to shorten the critical path. which of the following is not one of the ways to shorten
a critical path?

 Ans: Reduce the use of current resources.


10). Brainstorming and checklist are two main approaches to _____?

 Ans: Risk Identification.


11). The basis of successful project management is:

 Ans: 1. Accurate information.
2. Identifying the project stake holder's objectives.
3. Ensuring that these objectives are met.


12). The first step in producing a resource allocation plan is to

 Ans: To list the required resources and there expected level of demand.


13). Pbss indicate:

 Ans: a. The hierarchy of the products in a PBS.
b. The precedence between the components of a PBS.
c. The cost and benefits associated with a PBS.


14). ______ cost category ensures that projects are charged directly for use of resources.

 Ans: Usage cost.


15). Which of the following is not true about the similarity between pert and cpm networks:



PaperStoc.com Page 2 of 12

Geschreven voor

Vak

Documentinformatie

Geüpload op
18 maart 2024
Aantal pagina's
12
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$17.74
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Academik001 Exam Questions
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
16
Lid sinds
3 jaar
Aantal volgers
10
Documenten
2263
Laatst verkocht
1 jaar geleden

Buy Best Exam Answers

4.0

2 beoordelingen

5
1
4
0
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen