Maryland Asbestos exam question and completely solved answers rated A+.
The lean ratio of an extension ladder - Answer- 4:1 According to AHERA, to complete a response action of a non-NESHAP size project, how many samples must be taken with results of what? - Answer- 5 samples taken inside with results of each 0.0 f/cc What are the notification requirements in Virginia? - Answer- 20 calendar days for any project greater than 10 sq feet or linear feet In what jurisdiction do individuals need an asbestos supervisor or working linsense - Answer- Need a license everywhere Type of bond that would ensure that the general contractor will compensate subcontractors for labor and materials - Answer- Performance Bond Minimum respiratory protection on a class 1 asbestos project with no NEA - Answer- Full face air purifying respirator What is the maximum content permitted in the work area where an air purifying respirator is being worn? - Answer- 23.5% Chest XRays must be evaluated by what class reader? - Answer- Class B What is the APF for a full face air purifying respirator - Answer- 50 Friable ACM is any material that can be: - Answer- Crushed, pulverized, reduced to powder by hand pressure when dry The OSHA permissible exposure limit is - Answer- 0.1 f/cc over 8 hours TWA According to ASHERA, how many air samples must be taken for final clearance for NESHAP size project? - Answer- 13 samples (5 inside, 5 outside, 2 fields blanks , one sealed blank)TEM
Geschreven voor
- Instelling
- Maryland asbestos
- Vak
- Maryland asbestos
Documentinformatie
- Geüpload op
- 27 maart 2024
- Aantal pagina's
- 9
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
maryland asbestos exam question and completely sol