Project Checklist
ICASAD505A Develop technical requirements for business
Unit(s) of Competency
solutions
Student’s Name
During the demonstration of skills did the student:
(Tick if completed)
Research business requirements
Analyse the impact of technical solutions
Interface analysis
Software requirements
Cost of implementation.
Develop and test business solution
Effects of solution and training needs
Secure sign-off of validated solution
Trainer’s Name: Date: / /
Trainer’s Signature:
, Assessor’s comments
Reviewed
Auditor’s name: Date: / /
Auditor’s Signature:
Instructions for assessor(s)
Ensure that all activities are completed. Ensure the completeness of this form before handling to the training manager.
Provide a copy of this document to the student.
Results of this assessment are to be recorded in to the SAFHIN system.
Person responsible for recording to SAFHIN:
SAFHIN Code:
ICASAD505A Develop technical requirements for business
Unit(s) of Competency
solutions
Student’s Name
During the demonstration of skills did the student:
(Tick if completed)
Research business requirements
Analyse the impact of technical solutions
Interface analysis
Software requirements
Cost of implementation.
Develop and test business solution
Effects of solution and training needs
Secure sign-off of validated solution
Trainer’s Name: Date: / /
Trainer’s Signature:
, Assessor’s comments
Reviewed
Auditor’s name: Date: / /
Auditor’s Signature:
Instructions for assessor(s)
Ensure that all activities are completed. Ensure the completeness of this form before handling to the training manager.
Provide a copy of this document to the student.
Results of this assessment are to be recorded in to the SAFHIN system.
Person responsible for recording to SAFHIN:
SAFHIN Code: