Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

QSP COURSE QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
30-03-2024
Written in
2023/2024

QSP COURSE QUESTIONS AND ANSWERS

Institution
Course

Content preview

QSP COURSE QUESTIONS AND ANSWERS
What does this permit regulate? - Answer- Discharges of pollutants in storm water
associated with construction activity (storm water discharges) to waters of the united
states from construction site that disturb one or more acres of land surface, or that are
part of a common plan of development or sale that disturbs more than one acre of land
surface.

The person in charge of the utility company, municipality, or other public or private
company or agency that owns or operates the __________ may also serve as the LRP.
- Answer- LUP

Sediment basins, at a minimum, shall be designed according to the CASQA
Construction BMP Guidance Handbook. - Answer- True

In the RUSLE equation, "P" stands for - Answer- Management operations and support
practices.

Management operations and support practices. - Answer- Management operations and
support practices.

When does risk level one has to sample? - Answer- When required for non-visible
pollutants.

ATS instruments shall record which of the following? - Answer- Flow, turbidity, and pH

Which factor(s) of RUSLE can be based on site-specific analysis rather than maps? -
Answer- K and LS

Failure to obtain coverage under the permit for storm water discharges to waters of the
US is a violation of the - Answer- Clean Water Act and California Water Code

For traditional construction projects the LRP may be - Answer- The person who
possesses real properly interest in the land upon which the construction activities will
occur for the regulated site

What does NTU measure? - Answer- a measurement of optical properties of a liquid
that cause light rays to be scattered and absorbed rather than transmitted in straight
lines through a sample.

Inspection Records have to be kept until the project is complete or three years,
whichever comes first. - Answer- False

Which factor(s) of RUSLE must be changed to recalculate risk when the construction
duration has changed? - Answer- R

, BMP stands for - Answer- Best Management Practice

Do type 1 LUPs typically have a high potential to impact storm quality? - Answer- No

What does RUSLE stand for? - Answer- Revised Universal Soil Loss Equation

A discharger must notify the Regional Water Boards if there are planned changes in the
construction activity that - Answer- May result in non-compliance

A qualifying storm event is - Answer- A rain even that produces 1/2 inch or more of
precipitation with a period of 48 hours or more between rain events.

Continuous monitoring (no less than 15-min intervals) of ATS is required for: - Answer-

Rain Event Action Plan must be developed by a QSD - Answer- False

The CGP allows for not monitoring under what conditions? - Answer- Dangerous
weather conditions, unsafe storm event, and outside of scheduled operations.

What is the difference between erosion and sedimentation? - Answer- Erosion is the
dislodging and transport of soil and sedimentation is the deposition of material.

CSMP stands for - Answer- Construction Site Monitoring Program

What weather forecast would trigger a reap? - Answer- 50% chance of rain, within 48
hours.

During routine inspection a LUP discharger observes a non-stormwater discharge and
therefore must prepare a non storm water report. - Answer- UNSURE* but: False (no
non-stormwater report exists?)

What BMP does the permit discourage? - Answer- Plastic cover (maybe sediment
basin?)

What factors are used for RUSLE? - Answer- R, K, LS, C, P

Which two best represent an ATS "mode of operation"? - Answer- Flow through and
Batch treatment

What does NPDES stand for? - Answer- National Pollutant Discharge Elimination
System

When shall a discharger conduct a construction site evaluation and run-on evaluation? -
Answer- Whenever the results from a storm event daily average indicate that the
discharge is below the lower NAL for pH, exceeds the upper NAL for pH, or exceeds the
turbidity NAL.

Written for

Course

Document information

Uploaded on
March 30, 2024
Number of pages
5
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights Birkbeck, University of London
Follow You need to be logged in order to follow users or courses
Sold
1154
Member since
4 year
Number of followers
882
Documents
20299
Last sold
5 days ago

4.0

221 reviews

5
121
4
43
3
24
2
11
1
22

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions