Ust Inspector Final Exam Review With Correctly Answered Answers 2024/2025
Ust Inspector Final Exam Review With Correctly Answered Answers 2024/2025 How long does an owner have to fix a significant violation that does not pose an imminent threat to human health and safety or environment before being issued a red tag? a) 24 hours b) 48 hours c) 7 days d) 30 days - CORRECT ANSWER-c) 7 days; CCR 2717.1(b) Which one of the following can perform ELD? a) licensed tank tester b) licensed state contractor c) ICC certified service technician d) Professional Engineer - CORRECT ANSWER-a) licensed tank tester; CCR2644.1 and 2643(f); HSC 25484.4 Which one contains the requirements for installing, repairing, and monitoring UST's? a) Health and Safety Code Chapter 6.7 b) Fire Code ABCD c) California Code of Regulations Chapter 16, Title 22 d) Code of Federal Regulations, 29 Chapter 6 - CORRECT ANSWER-a) HSC Chapter 6.7 and CCR Title 23 A monitoring system certification includes all of the following EXCEPT a) submittal of a completed Monitoring System Certification form b) pre-notification to the local agency of scheduled Monitoring System Certification date c) affixing a tag/sticker to each monitoring equipment component that is certified, repaired, or replaced d) posting the Monitoring System Certification from a visible location at the UST facility - CORRECT ANSWER-d) posting the Monitoring System Certification from a visible location at the UST facility; CCR 2638 Which of the following is not a valid overfill prevention method? a) Spill bucket b) ATG with audible/visual alarm c) Ball float valve d) Flapper valve - CORRECT ANSWER-a) Spill bucket; CCR 2635(b)(2) What is the purpose of interstitial monitoring?
Written for
- Institution
- UST Inspector Eam
- Course
- UST Inspector Eam
Document information
- Uploaded on
- April 1, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
ust inspector final exam review with correctly an
-
how long does an owner have to fix a significant v
-
the local agency inspectors shall renew the icc ce
-
temporary closure is appropriate for which of t
Also available in package deal