Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CDFM Module 4 Complete Questions With 100% Verified answers

Beoordeling
-
Verkocht
-
Pagina's
16
Cijfer
A+
Geüpload op
14-04-2024
Geschreven in
2023/2024

CDFM Module 4 Complete Questions With 100% Verified answers What are Joint Acquisition Programs? Joint Acquisition Programs is any acqusition system, subsystem, component, or technology program with astrategy that includes funding by more than one DoD component during any phase of a system's life cycle. Who decides to place programs under joint acquisition management? The MDA decides whether to place programs under joint management and designates the lead executive DoD component. What law requires an analysis of potential opportunities of international cooperation? 10 USC 2350a(e) requires international cooperation consideration in the initial aquisition strategy for a program. When international programs may be established in the defense acqusition program Decision to include international partners needs to be included during development of the initial capabilities document but no early than the material and solution analysis phase. When is Earned Value Management (EVM) implemented EVM is part of program management . It ensures that cost , schedule and technical aspects of the contract are truly integrated. In what type of contracts EVM is required EVM is required on Cost, and/or Incentive contracts valued at greater than $20M. What is EVM? Earned Value Management is a tool that 1. Relates the scope of the work to its associated budgets and schedule. 2. Measures the work progress in objective terms 3. States that value of the work completed in dollars and other measurable units. What are EVM techniques? Correlate the budgeted cost of worked scheduled with the budget cost of work performed (BCWP) 1. 0/100 Earned Value Technique 2. Percent Start/Percent Finish EV Technique (50/50) (25/75) (80/20) 3. Percent Complete 4. Units Completed 5. Equivalent Units Describe the Percent Start/Percent Finish EV Technique Is an objective earned value technique tied to the start and completion of a work package task, often referred to % assigned to the start and finish milestone such as (50/50...)

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

CDFM Module 4 Complete Questions With
100% Verified answers

What are Joint Acquisition Programs?
Joint Acquisition Programs is any acqusition system, subsystem, component, or technology program
with astrategy that includes funding by more than one DoD component during any phase of a
system's life cycle.


Who decides to place programs under joint acquisition management?
The MDA decides whether to place programs under joint management and designates the lead
executive DoD component.


What law requires an analysis of potential opportunities of international cooperation?
10 USC 2350a(e) requires international cooperation consideration in the initial aquisition strategy for
a program.


When international programs may be established in the defense acqusition program
Decision to include international partners needs to be included during development of the initial
capabilities document but no early than the material and solution analysis phase.


When is Earned Value Management (EVM) implemented
EVM is part of program management . It ensures that cost , schedule and technical aspects of the
contract are truly integrated.


In what type of contracts EVM is required
EVM is required on Cost, and/or Incentive contracts valued at greater than $20M.


What is EVM?
Earned Value Management is a tool that
1. Relates the scope of the work to its associated budgets and schedule.
2. Measures the work progress in objective terms
3. States that value of the work completed in dollars and other measurable units.


What are EVM techniques?
Correlate the budgeted cost of worked scheduled with the budget cost of work performed (BCWP)
1. 0/100 Earned Value Technique
2. Percent Start/Percent Finish EV Technique (50/50) (25/75) (80/20)
3. Percent Complete
4. Units Completed
5. Equivalent Units


Describe the Percent Start/Percent Finish EV Technique
Is an objective earned value technique tied to the start and completion of a work package task, often
referred to % assigned to the start and finish milestone such as (50/50...)
Thsi technique tends to overstate performance in the first half of the period of performance and
uderstate performance in the last half.

,What is the most important step in EVM system?
Is the establishment of the Performance Measurement Baseline (PMB)or the Budgeted Cost of Work
Schedule (BCWS)


What is the PMB in and EVM?
The PMB includes the undistributed budget, all summary level planning package budgets, and all
control account budgets. It does not include management reserve.


What is the final step of the PMB?
Is to classify work, to allocate the budget and to time phase the control account work package
budgets. This last phase is calculate BWCS


How do we classify work packages in EVM?
in 3 categories, Discrete, apportioned effort, and level of effort.


Describe the realignment of the PMB
Rebaselining, Replanning, and Reprogramming


What is Reprogramming?
Reprogramming is a comprehensive realignment of the remaining performance measurement
baseline that results in a total budget and/or total schedule that exceeds the contractual
requirements. It is the process that results in an Over-Target Baseline or OTB and an Over-Target
Schedule OTS.


Schedule Performance Index (SPI) formula
SPI=BCWP/BCWS


Estimate at Completion (EAC) formula
EAC=ACWP+[(BAC-BCWP)/(Performance Factor)]


EAC Compsite formula
ACWPcum+[(BAC-BCWPcum)/(CPIcum*SPIcum)]
Upper Value (worst case)


EVM Terminology
EAC=Estimate at Completion
BAC=Budget at Completion(current)
BCWS=Budget Cost of Work Scheduled (current)
BWCP=Budget Cost of Work Performed (earned value)
ACWP=Actual Cost of Work Performed


What is the Contractor Cost and Software Data Reporting (CSDR)
The CSDR system involves two formal contractor reports, the COntractor Cost Data Report (CCDR) and
the Software Resources Data Report (SRDR)

, What is Contract Performance Report (CPR)
The PM should obtain from the contractor a CPR (DD form 2734) on all contracts the meet or exceed
EVMS dollar thresholds and require EVMS compliance. The CPR provides contract cost and schedule
performance for program mangement.


What is Contract Funds Status Report (CFSR)
(DD 1586) has no specific application thresholds but PMs should evaluate contracts of less than
$1.3M. FFP contracts should not apply the CFSR unless unusual circumnstances dictate funding
visibility.


What is Government Contract Quality Assurance (GCQA)
DCMA Q&A personnel conducts quality assurance as identified in contract administration delegations
by the KO.


What is Independent Management Reviews (Peer Reviews)
The Director, DPAP organizes review teams and facilitate pre-award and post-award peer reviews for
all service contracts with a value of $1B or more (including options)


What are Milestone Decision Points?
Milestione Decision Points initiate programs and auhtorize entry into major acquisition process
phases


MDP B
A favorable decision formally initiates an acquisition program


Where are Technology Readiness Assessments reviewed?
At Milestone B & C


Milestone Decision Point C
A succesfull outcome at MDP C, results in the program moving into Production and deployment phase


At what MDP, if necessary, are Independent technology Readiness Assesments done?
At MDP B&C


What are the 4 major reviews?
Materiel Development Decision Review
Preliminary Decision Review
Critical Design Review
Full Rate Production Decision Review


What is the role fo USD (AT&L)
AT&L is the Defense Acqusition Executive (DAE) and conducts Defense Acquisition Board reviews for
acquisition category ID programs at major program milestones.


Who advises USD (AT&L) on major acqusitiion decisions?
The Defense Acqusition Board (DAB)

Geschreven voor

Vak

Documentinformatie

Geüpload op
14 april 2024
Aantal pagina's
16
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
LectDeniz Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
21
Lid sinds
2 jaar
Aantal volgers
13
Documenten
4974
Laatst verkocht
7 maanden geleden
Lect Deniz Academic Resources Hub

Lect Deniz is a highly experienced academic tutor and dedicated content creator with a strong track record of developing comprehensive, high-quality study materials for a wide range of university courses across the globe. With years of experience in higher education support, he excels at transforming complex academic concepts into clear, structured, and easy-to-follow resources that enhance student understanding and confidence. He provides an extensive collection of well-researched and carefully organized documents across key disciplines, including nursing, medicine, and various science fields. His materials cover essential topics such as anatomy, physiology, pharmacology, clinical practice, and core scientific principles, making them highly valuable for both coursework and intensive exam preparation. Each document is thoughtfully designed to align with university standards and curricula, ensuring accuracy, relevance, and practical application. Lect Aziim’s work stands out for its clarity, depth, and attention to detail, offering students concise summaries, detailed explanations, and exam-focused content that supports effective revision. His commitment to academic excellence and student success is reflected in the consistency and reliability of his materials, making him a trusted resource for learners seeking to improve performance and achieve their academic goals.

Lees meer Lees minder
5.0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen