Splices in rall tracks shall have - ANSWER Smooth Joints Hydraulic systems should have their proper fluid level checked - ANSWER Daily If power fails during operations, the following shouldn't apply - ANSWER Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER Person responsible for lift Where should climbing instructions be kept - ANSWER ON Site All climbing operations shall be performed under the supervision of - ANSWER Qualified person When cranes are erected, load limiting devices shall be tested for proper setting and operation - ANSWER Before crane is placed in service Hooks shall be equipped with latches unless the application makes the use of the latch - ANSWER Impractical Size and position of signs or panels must satisfy the limitations of - ANSWER Manufacturer Fall prevention measures are needed for working at locations where you are exposed - ANSWER To a fall of 6ft or more Travel distance on hand levers shall not be greater - ANSWER than 14 inches from neutral position For power lines rated 175KV the minimum clearance between the lines and any part of the crane or load is - ANSWER 15ft All controls shall be tested by the operator at the - ANSWER start of new shift Before each climbing operation all load members of the support system shall be - ANSWER Inspected Chain slings are required to be - ANSWER ID tagged Welding on loads suspended by the crane can only be done if the load has - ANSWER Insulated slings NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct) How much does an average cubic yard of concrete weight - ANSWER 4,000 lbs Main power switch for tower crane is - ANSWER At base of crane Items not listed in the frequent inspection checklist are - ANSWER Hydraulic pumps and valves for excessive wear or damage When is it necessary to determine that there is no practical alternative way to perform the needed work or to gain access to the area - ANSWER Personnel Lift Each series of voice signals shall contain three elements stated in the following order - ANSWER Function and Direction - Distance and speed - Function stop When lifting personnel communication shall be maintained between three of the next four - ANSWER Person(s) being lifted - Operator - Signal person The condition when the tower load block or hook assembly comes in contact with the upper - ANSWER Two-blocking Load bearing members of the climbing and support system shall be inspected before each - ANSWER Climbing operation Where shall a wind velocity indicating device be mounted - ANSWER At or near the top of crane A velocity readout shall be provided - ANSWER At the operators station The area inside the self erecting tower cranes tail swing must be - ANSWER Barricaded The self erecting tower crane must be properly grounded according with the - ANSWER National electric code (NEC) Self Erecting tower crane erection must be performed by - ANSWER Qualified person Extensive planning must occur before a self erecting tower crane arrives on the job site. The plan should be divided into two major sections as follows - ANSWER Delivery, set up, erection and dismantle - Lifting operations According to ASME B30.3 the minimum wraps to be left on a hoist drum are - ANSWER 3 How much does a cubic foot of steel weigh - ANSWER 490lbs When operating a tower crane and there is an uncontrolled movement, the operator should - ANSWER Engage emergency stop What will not create a change in stability - ANSWER Pulling off a fixed load When performing a load test on a tower crane that travels. How should the job be set - ANSWER So the maximum weight is on the bogie When plumbing a tower crane after it has been climbed, the crane must - ANSWER be balanced Which of the following OSHA regulations govern suspended personnel platforms - ANSWER OSHA 1926.550(g) According to ASME B30.3, the prohibited zone for power lines that are 60kV is - ANSWER 15ft. ASME 3-3.3.4.3(1) Table 1 According to ASMA 30.3, load hoist rotation resistant wire rope has a design factor of - ANSWER 5 to 1 ASME 3-1.5.5(b) According to ASME B30.3, when lifting a suspended personnel platform the design factor for the rigging hardware is - ANSWER 5 to 1 ASME 3-3.2.2(b)(3) According to ASME B30.3, Load hoist ropes that are not rotation must have a design factor of - ANSWER 5 to 1 ASME 3-1.5.5(b) The OSHA construction standard for rigging equipment is - ANSWER 1926.251 According to ASMA B30.3, on whose recommendations should a preventative maintenance program be set up - ANSWER Crane manufacturer ASME 3-2.3.1(a) When using cable or nylon spreaders it is important to remember - ANSWER The lower the spreader angle the greater the tension According to OSHA when testing a man basket how long must the test pick be maintaned - ANSWER 5 minutes. OSHA 1926.550 (g)(5)(vi) According to ASME B30.3, what is the minimum pitch diameter for load hoisting sheaves - ANSWER not less than 18 times rope diameter ASME 3-1.5.4(d) According to ASME B30.3, what is the minimum pitch diameter for load block sheaves - ANSWER not less then 16 times rope diameter ASMA 3-1.5.4(d) According to ASME b30.3, what is the minimum pitch diameter for boom hoist sheaves - ANSWER not less then 15 times rope diameter ASME 3-1.5.4(d) According to OSHA when lifting personnel the cranes hook must be the types that - ANSWER Can be closed and locked OSHA 1926.550(g)(4)(iv)(B) According to OSHA, when working over water with a man basket are the people inside required to wear a belt/harness - ANSWER No harness or belt required OSHA 1926.550(g)(6)(VII) According to ASME B30.3, when working near power lines where should caution stickers be installed - ANSWER At operators station and at the base of the crane ASME 3-3.4.3(f) According to OSHA a frequent inspection is - ANSWER Daily to monthly OSHA 1910.180(d)(2)(i) According to OSHA a periodic inspection is - ANSWER Monthly to annually OSHA 1910.180(d)(2)(ii) Cranes idle for more than six months must have inspections performed: - ANSWER Frequent and Periodic ASME 3-2.1.5(b)

Meer zien Lees minder
Instelling
NCCCO Tower Crane
Vak
NCCCO Tower Crane










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
NCCCO Tower Crane
Vak
NCCCO Tower Crane

Documentinformatie

Geüpload op
15 april 2024
Aantal pagina's
16
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$14.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
STUDYROOM2026 Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
410
Lid sinds
3 jaar
Aantal volgers
212
Documenten
3903
Laatst verkocht
3 weken geleden

For all Nursing Test Banks visit my page. All Papers are Verified and Graded to Score A++ Wish you Success.

3.6

63 beoordelingen

5
22
4
14
3
14
2
4
1
9

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen