Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Michigan Builders License Exam Questions and Answers, Updated 2024/2025 (Already Graded A+)

Beoordeling
-
Verkocht
-
Pagina's
80
Cijfer
A+
Geüpload op
16-04-2024
Geschreven in
2023/2024

IRC (International Residential Code) -Ans Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. First 2 chapters of code book are -Ans Administrative Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F -AnsTrue Does the building official have the authority to render interpretations of the code? -AnsYes None of the following require a permit, EXCEPT: sidewalks and driveways tiling an 8 foot fence playground equipment -Ans 8 foot fence. Tables and illustrations are always supported by information found in the written code and footnotes. T or F -AnsFalse The amount of evenly distributed weight imposed by inhabitants, goods and removable objects on a floor or roof system is referred to as -AnsLive load. If a code requirement is in the book, it is both acceptable and enforceable by the code official. T or F -AnsTrue. Illustrations are typically referred to as -Ans Figures. Michigan Builders License Exam Questions and Answers 2024/2025 (Already Passed) Generally speaking, the building official's job is to -Ans Determine that buildings are built to the minimum enforceable standard. It is required that all manufacturer instructions be at the jobsite at the time of inspection. T or F -AnsTrue. All of the following are not considered habitable spaces EXCEPT: bathrooms kitchens storage spaces closets -AnsKitchen. Bathrooms must be provided with an aggregate glazing area no less than _____ square feet, half of which must be openable. -Ans 3. The maximum height of an egress window above the floor is -Ans 44 inches. A basement bedroom must have an egress window with a clear opening of at least ______ square feet. -Ans 5.7 sq ft. At least one side-hinged exit door must be in each dwelling unit, and must be _____ feet wide. - Ans3. A porch more than _____ inches above grade must be provided with 36" guards. -Ans30 inches. Wall and ceiling finishes shall have a flame-spread classification of no more than ______ . - Ans200. According to code, concrete must reach at least 70% of it's ability within ____________days. - Ans7 days. A stud used for a non-bearing partitions may not be notched more than ____% of the stud width. -Ans40%. The Michigan Uniform Energy code applies to new buildings as well as -Ans Additions, alterations, renovation and repairs. ___________ is a measure of how well the window or door assembly conducts heat. The lower the number, the better insulation the assembly will provide. -Ans U-factor. Energy losses from recessed lighting fixtures can often reach ___% of the total thermal loss of a ceiling. -Ans50%. Michigan requires a minimum thermal resistance of ____________for mechanical system piping. -Ans R-3. Oversized HVAC equipment has a higher initial cost, a higher operating cost, provides less comfort, and shorter life expectancy. T or F -AnsTrue. _______ is the compliance route that applies Table 402.1.1 to building envelope components, and is considered the most simple. -AnsPrescriptive Path. ___________ can be used to satisfy U-factor and SHGC requirements. -AnsArea weighted averages. Recessed lights must be _____ rated. -Ans IC (Insulation Contact) Up to 15 square feet of glazing per dwelling unit is exempted from U-value requirements. T or F -AnsTrue. The 2009 IECC requires a permanent certificate posted on the electrical distribution panel. The certificate shall be completed by the builder or -Ans Registered design professional. One hurdle contractors face when bidding for an energy efficient project is choosing materials that fit the design, and also meet -AnsState energy code requirements. Historically significant buildings are not exempt from code changes. T or F -AnsFalse. Insulation products (blown and sprayed) must be documented with: -AnsR-value Settled thickness Manufacturer name The new Michigan codes took effect in -Ans March 2011. Below grade walls are insulated from the top of the basement wall down to _____ below grade, or the basement floor, whichever is less. -Ans 10. The _______ is the combined Solar Heat Gain Coefficient of all the glazed fenestration products in the building. -AnsArea weighted average. Plans and specifications must be detailed in regards to: -AnsThermal insulation R-values Design criteria Equipment systems In Michigan, the residential energy code is based on the _____ IECC, with certain amendments. -Ans2009. ___________ is the rate of air infiltration in the presence of a specific pressure differential. - AnsAir leakage. Air leakage is the random movement of air into and out of ________ through cracks and holes. - AnsWindows Attic access hatches Recessed lights R-values for insulation and fenestration requirements by component can be found in -Ans Table 402.1.1 2009 IECC IECC -AnsInternational Energy Conservation Code The _____________ compliance method allows for more innovative construction techniques like SIPs or Advanced Framing. -AnsU-factor and UA alternatives. R-30 is permitted in vaulted ceilings, but is limited to -Ans 500 sq feet Floor insulation must be installed to maintain permanent and continuous contact with the underside of the subfloor decking. T or F -Ans True. Michigan falls into climate zones -Ans5, 6 and 7. It is permissible for supply ducts to be run through the framing cavities of a residential building. T or F -AnsFalse. __________ means an electrical fixture has been tested and listed as suitable for installation in a cavity where the fixture may come in contact with insulation. -AnsIC rated (Insulation Contact) According to the Dept. of Energy, improved energy codes could reduce CO2 emissions by - Ans3%. EMAIL ME: For help with report, Assignment, Essay and thesis writing Attic insulation markers must be installed every _____ square feet. -Ans 300 sq ft. Buildings that are exempted from the new regulations are those with very low energy use or ones that are neither heated or cooled. T or F -Ans True. A contractor needs to remove a non-load bearing wall, does he need to pull a permit? -Ans Yes. A concrete contractor has been hired by an owner to install a driveway and sidewalks. The lot is flat and the concrete is being place on undisturbed earth with a prepared base. Does the contractor need to pull a permit? -AnsNo. A permit has been issued for a building project and there is a code infraction in the building plans that has been overlooked by the building official. Can the building official require a correction to a project that they previously overlooked? -AnsYes. Who issues a well and septic permit? -AnsHealth department. Permits are not required for one story detached accessory structures not exceeding: -Ans 200 sq. feet. IRC R105 If work requiring a permit is provided in an emergency situation, the permit application must be submitted within: -Ans The next business day. If an inspection official is refused entry to a building project, the official will have recourse to the remedies provided by law which include securing a warrant from the court and returning with an officer of the law. -Ans True. Can a building official be held liable for any damage occurring to persons or property as a result of their actions or inaction? -AnsNo. IRC R104.8 An owner needs a foundation wall repaired, it has seriously buckled due to excessive lateral loading from soil pressure. Does the contractor need to pull a permit? -Ans Yes. Although contractors should check for restrictive covenants and local zoning requirements, a permit isn't required from the building official for installing a fence not over _______ tall. - Ans6 ft. IRC R105.2 If a permit is applied for but not yet approved and the applicant is not persueing approval after______ days the application will be considered abandoned. -Ans 180 days. Can a building official revoke a Certificate of Occupancy? -Ans Yes. When a project requiring a permit has commenced prior to the issuance of a permit, the building official is authorized to charge an additional fee. T or F -AnsTrue. Foam plastic is used as insulation. The flame spread index cannot exceed 75 and the smoke development index cannot exceed -Ans450 Foam plastic used for interior trim shall have a maximum thickness of 1/2" and a maximum width of -Ans8". Foam plastic interior trim must not constitute more than __________ of the total wall and ceiling area of any room or space. -Ans10%. Foam plastic used as insulation in walls must be separated by an approved thermal barrier. What is the minimum thickness of gypsum wall board being used as a thermal barrier for spray foam insulated walls? -Ans 1/2". Which of these inspections happens last? Mechanical rough Plumbing rough Framing Electrical rough -AnsFraming. A retaining wall will be five feet tall from the bottom of the footing to the top of the wall. Do you need to pull a permit? -AnsYes. Your building is utilizing engineered products such as engineered floor joists. When do the installation instructions need to be available at the work site? -Ans At the time of inspection. A door directly between a garage and a residence shall never open directly into a sleeping room. The door must also be -Ans1 3/8" solid wood 1 3/8" honeycomb core 20 minute fire rated Any of the above The nosing for stairs shall not be less than 3/4" but not be more than -Ans 1 1/4" A front porch is 25 inches above the grade below. Are guards required to be installed? -Ans No. If a smoke alarm is in a bedroom, it doesn't need to be right outside the bedroom also. -Ans False. If spray foam insulation is used to insulate a wall, what is the minimum thickness of drywall needed to cover the foam plastic? -Ans1/2" Finishing materials used for walls and ceiling shall have a flame-spread index not to exceed - Ans200 Wood joists are 19" above exposed ground. Do they have to be preservative treated or naturally durable wood? -AnsNo. You may bulldoze, grade and remove tree stumps in a wetland as long as you have a permit. - AnsTrue. Current code requires that the lowest floors in newly constructed buildings in flood hazard areas not located in designated Coastal A Zones, must have the lowest floors elevated to or above the 100-year design flood elevation. T or F -AnsTrue. What are the three basic soil types? -Ans Cohesive, granular, organic. The principal reasons to understand soil composition are to: -Ans Reduce settling Provide stability Increase load-bearing capacity If a excavating company needs to haul away 125 yards of bank soil that will swell 20% how many yards of loose soil will they haul away? -Ans 150 yards The exact location of property lines should be determined early in the design phase in order to comply with __________ requirements. -AnsSetback. A garden shed over 200 square feet will require a T or F -Ans True. What tool would you use to peel back topsoil? -Ans Bulldozer. _________ the root system of a tree during construction can potentially kill it. -Ans Cutting into Piling soil over Compacting You would use a ________ to determine a floor is level, but this tool would not help determine if a wall is plumb. -AnsBuilders level. The condition of erosion control devices must be checked after a rainfall event of _______ or more within a 24 hour period. -Ans 1/2 inch. A side yard easement of 15 feet means your building structure must be: -Ans15 feet from the property line. You can identify survey monuments by the following -AnsWho set the monument When was it set Where was it set Public _________ provide utilities access to run lines or pipes across or under your property. - AnsEasements. A deposit of earth material placed by artificial means is called -AnsFill. Grading is changing the earth surface by either excavating or filling or a combination of both. T or F -AnsTrue.

Meer zien Lees minder
Instelling
Michigan Builders License
Vak
Michigan builders license











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Michigan builders license
Vak
Michigan builders license

Documentinformatie

Geüpload op
16 april 2024
Aantal pagina's
80
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
STUDYROOM2026 Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
410
Lid sinds
3 jaar
Aantal volgers
212
Documenten
3903
Laatst verkocht
3 weken geleden

For all Nursing Test Banks visit my page. All Papers are Verified and Graded to Score A++ Wish you Success.

3.6

63 beoordelingen

5
22
4
14
3
14
2
4
1
9

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen