Michigan Builders License Exam Questions With 100% Correct Answers | Verified | Latest Update 2024/2025
Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - Correct Answer-IRC (International Residential Code) Administrative - Correct Answer-First 2 chapters of code book are True - Correct Answer-Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F Yes - Correct Answer-Does the building official have the authority to render interpretations of the code? 8 foot fence. - Correct Answer-None of the following require a permit, EXCEPT: sidewalks and driveways tiling an 8 foot fence playground equipment False - Correct Answer-Tables and illustrations are always supported by information found in the written code and footnotes. T or F Live load. - Correct Answer-The amount of evenly distributed weight imposed by inhabitants, goods and removable objects on a floor or roof system is referred to as True. - Correct Answer-If a code requirement is in the book, it is both acceptable and enforceable by the code official. T or F Figures. - Correct Answer-Illustrations are typically referred to as Determine that buildings are built to the minimum enforceable standard. - Correct Answer-Generally speaking, the building official's job is to True. - Correct Answer-It is required that all manufacturer instructions be at the jobsite at the time of inspection. T or F Kitchen. - Correct Answer-All of the following are not considered habitable spaces EXCEPT: bathrooms Michigan Builders License Exam Questions With 100% Correct Answers | Verified | Latest Update 2024/2025 kitchens storage spaces closets 3. - Correct Answer-Bathrooms must be provided with an aggregate glazing area no less than _____ square feet, half of which must be openable. 44 inches. - Correct Answer-The maximum height of an egress window above the floor is 5.7 sq ft. - Correct Answer-A basement bedroom must have an egress window with a clear opening of at least ______ square feet. 3. - Correct Answer-At least one side-hinged exit door must be in each dwelling unit, and must be _____ feet wide. 30 inches. - Correct Answer-A porch more than _____ inches above grade must be provided with 36" guards. 200. - Correct Answer-Wall and ceiling finishes shall have a flame-spread classification of no more than ______ . 7 days. - Correct Answer-According to code, concrete must reach at least 70% of it's ability within ____________days. 40%. - Correct Answer-A stud used for a non-bearing partitions may not be notched more than ____% of the stud width. Additions, alterations, renovation and repairs. - Correct Answer-The Michigan Uniform Energy code applies to new buildings as well as U-factor. - Correct Answer-___________ is a measure of how well the window or door assembly conducts heat. The lower the number, the better insulation the assembly will provide. 50%. - Correct Answer-Energy losses from recessed lighting fixtures can often reach ___% of the total thermal loss of a ceiling. R-3. - Correct Answer-Michigan requires a minimum thermal resistance of ____________for mechanical system piping. True. - Correct Answer-Oversized HVAC equipment has a higher initial cost, a higher operating cost, provides less comfort, and shorter life expectancy. T or F Prescriptive Path. - Correct Answer-_______ is the compliance route that applies Table 402.1.1 to building envelope components, and is considered the most simple. Area weighted averages. - Correct Answer-___________ can be used to satisfy Ufactor and SHGC requirements. IC (Insulation Contact) - Correct Answer-Recessed lights must be _____ rated. True. - Correct Answer-Up to 15 square feet of glazing per dwelling unit is exempted from U-value requirements. T or F Registered design professional. - Correct Answer-The 2009 IECC requires a permanent certificate posted on the electrical distribution panel. The certificate shall be completed by the builder or State energy code requirements. - Correct Answer-One hurdle contractors face when bidding for an energy efficient project is choosing materials that fit the design, and also meet False. - Correct Answer-Historically significant buildings are not exempt from code changes. T or F R-value Settled thickness Manufacturer name - Correct Answer-Insulation products (blown and sprayed) must be documented with: March 2011. - Correct Answer-The new Michigan codes took effect in 10. - Correct Answer-Below grade walls are insulated from the top of the basement wall down to _____ below grade, or the basement floor, whichever is less. Area weighted average. - Correct Answer-The _______ is the combined Solar Heat Gain Coefficient of all the glazed fenestration products in the building. Thermal insulation R-values Design criteria Equipment systems - Correct Answer-Plans and specifications must be detailed in regards to: 2009. - Correct Answer-In Michigan, the residential energy code is based on the _____ IECC, with certain amendments. Air leakage. - Correct Answer-___________ is the rate of air infiltration in the presence of a specific pressure differential. Windows Attic access hatches Recessed lights - Correct Answer-Air leakage is the random movement of air into and out of ________ through cracks and holes. Table 402.1.1 2009 IECC - Correct Answer-R-values for insulation and fenestration requirements by component can be found in International Energy Conservation Code - Correct Answer-IECC U-factor and UA alternatives. - Correct Answer-The _____________ compliance method allows for more innovative construction techniques like SIPs or Advanced Framing. 500 sq feet - Correct Answer-R-30 is permitted in vaulted ceilings, but is limited to True. - Correct Answer-Floor insulation must be installed to maintain permanent and continuous contact with the underside of the subfloor decking. T or F 5, 6 and 7. - Correct Answer-Michigan falls into climate zones False. - Correct Answer-It is permissible for supply ducts to be run through the framing cavities of a residential building. T or F IC rated (Insulation Contact) - Correct Answer-__________ means an electrical fixture has been tested and listed as suitable for installation in a cavity where the fixture may come in contact with insulation. 3%. - Correct Answer-According to the Dept. of Energy, improved energy codes could reduce CO2 emissions by 300 sq ft. - Correct Answer-Attic insulation markers must be installed every _____ square feet. True. - Correct Answer-Buildings that are exempted from the new regulations are those with very low energy use or ones that are neither heated or cooled. T or F Yes. - Correct Answer-A contractor needs to remove a non-load bearing wall, does he need to pull a permit? No. - Correct Answer-A concrete contractor has been hired by an owner to install a driveway and sidewalks. The lot is flat and the concrete is being place on undisturbed earth with a prepared base. Does the contractor need to pull a permit? Yes. - Correct Answer-A permit has been issued for a building project and there is a code infraction in the building plans that has been overlooked by the building official. Can the building official require a correction to a project that they previously overlooked? Health department. - Correct Answer-Who issues a well and septic permit? 200 sq. feet. IRC R105 - Correct Answer-Permits are not required for one story detached accessory structures not exceeding: The next business day. - Correct Answer-If work requiring a permit is provided in an emergency situation, the permit application must be submitted within: True. - Correct Answer-If an inspection official is refused entry to a building project, the official will have recourse to the remedies provided by law which include securing a warrant from the court and returning with an officer of the law. No. IRC R104.8 - Correct Answer-Can a building official be held liable for any damage occurring to persons or property as a result of their actions or inaction? Yes. - Correct Answer-An owner needs a foundation wall repaired, it has seriously buckled due to excessive lateral loading from soil pressure. Does the contractor need to pull a permit? 6 ft. IRC R105.2 - Correct Answer-Although contractors should check for restrictive covenants and local zoning requirements, a permit isn't required from the building official for installing a fence not over _______ tall. 180 days. - Correct Answer-If a permit is applied for but not yet approved and the applicant is not persueing approval after______ days the application will be considered abandoned. Yes. - Correct Answer-Can a building official revoke a Certificate of Occupancy? True. - Correct Answer-When a project requiring a permit has commenced prior to the issuance of a permit, the building official is authorized to charge an additional fee. T or F 450 - Correct Answer-Foam plastic is used as insulation. The flame spread index cannot exceed 75 and the smoke development index cannot exceed 8". - Correct Answer-Foam plastic used for interior trim shall have a maximum thickness of 1/2" and a maximum width of 10%. - Correct Answer-Foam plastic interior trim must not constitute more than __________ of the total wall and ceiling area of any room or space. 1/2". - Correct Answer-Foam plastic used as insulation in walls must be separated by an approved thermal barrier. What is the minimum thickness of gypsum wall board being used as a thermal barrier for spray foam insulated walls? Framing. - Correct Answer-Which of these inspections happens last? Mechanical rough Plumbing rough Framing Electrical rough Yes. - Correct Answer-A retaining wall will be five feet tall from the bottom of the footing to the top of the wall. Do you need to pull a permit? At the time of inspection. - Correct Answer-Your building is utilizing engineered products such as engineered floor joists. When do the installation instructions need to be available at the work site? 1 3/8" solid wood 1 3/8" honeycomb core 20 minute fire rated Any of the above - Correct Answer-A door directly between a garage and a residence shall never open directly into a sleeping room. The door must also be 1 1/4" - Correct Answer-The nosing for stairs shall not be less than 3/4" but not be more than No. - Correct Answer-A front porch is 25 inches above the grade below. Are guards required to be installed? False. - Correct Answer-If a smoke alarm is in a bedroom, it doesn't need to be right outside the bedroom also. 1/2" - Correct Answer-If spray foam insulation is used to insulate a wall, what is the minimum thickness of drywall needed to cover the foam plastic? 200 - Correct Answer-Finishing materials used for walls and ceiling shall have a flamespread index not to exceed No. - Correct Answer-Wood joists are 19" above exposed ground. Do they have to be preservative treated or naturally durable wood? True. - Correct Answer-You may bulldoze, grade and remove tree stumps in a wetland as long as you have a permit. EMAIL ME: For help with report, Assignment, Essay and thesis writing True. - Correct Answer-Current code requires that the lowest floors in newly constructed buildings in flood hazard areas not located in designated Coastal A Zones, must have the lowest floors elevated to or above the 100-year design flood elevation. T or F Cohesive, granular, organic. - Correct Answer-What are the three basic soil types? Reduce settling Provide stability Increase load-bearing capacity - Correct Answer-The principal reasons to understand soil composition are to: 150 yards - Correct Answer-If a excavating company needs to haul away 125 yards of bank soil that will swell 20% how many yards of loose soil will they haul away? Setback. - Correct Answer-The exact location of property lines should be determined early in the design phase in order to comply with __________ requirements. True. - Correct Answer-A garden shed over 200 square feet will require a T or F Bulldozer. - Correct Answer-What tool would you use to peel back topsoil? Cutting into Piling soil over Compacting - Correct Answer-_________ the root system of a tree during construction can potentially kill it. Builders level. - Correct Answer-You would use a ________ to determine a floor is level, but this tool would not help determine if a wall is plumb. 1/2 inch. - Correct Answer-The condition of erosion control devices must be checked after a rainfall event of _______ or more within a 24 hour period. 15 feet from the property line. - Correct Answer-A side yard easement of 15 feet means your building structure must be: Who set the monument When was it set Where was it set - Correct Answer-You can identify survey monuments by the following Easements. - Correct Answer-Public _________ provide utilities access to run lines or pipes across or under your property. Fill. - Correct Answer-A deposit of earth material placed by artificial means is called True. - Correct Answer-Grading is changing the earth surface by either excavating or filling or a combination of both. T or F Rough grade. - Correct Answer-The stage at which the grade approximately conforms to approved plans is called: True. - Correct Answer-Water wells should be located on the opposite side or uphill side of the house from the drainfield. T or F Lifts. - Correct Answer-When back filling around the foundation the soil should be compacted in __________ of 6 inches at a time. True. - Correct Answer-The ablility to achieve maximum density when compacting soil requires that the soil has it's optimum moistute content. T or F True. - Correct Answer-The heavier the plates are on a vibratoty plate compactor the more compaction force it will generate. T or F False. - Correct Answer-All soil types have the same optimum moisture content for compaction. Plot plan and site plan. - Correct Answer-Which drawing shows the shape and boundary lines of a lot, as well as locating the building, driveway, sidewalks, well and septic system, elevation contours, etc.
Geschreven voor
- Instelling
- Michigan builders license
- Vak
- Michigan builders license
Documentinformatie
- Geüpload op
- 17 april 2024
- Aantal pagina's
- 59
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
michigan builders license
-
latest update 2024
-
graded
-
michigan builders license exam questions
-
exam questions with correct answers
Ook beschikbaar in voordeelbundel