Under a fixed fee approach to agency CM compensation, which of the following statements is NOT true? A) The fixed fee approach can have an adverse effect on both the CM and the owner. B) Unexpected problems could require a CM to expend more costs than budgeted for staff to perform tasks. C) The CM is not expected to perform a greater level of effort than originally anticipated. D) Some believe that a temptation always exists for the CM to put forth less effort than anticipated or actually required. - ...ANSWER...C) The CM is not expected to perform a greater level of effort than originally anticipated. The cost plus fixed fee method of CM compensation can be divided into two separate phases—pre-construction and construction. True False - ...ANSWER...True Under a cost plus fixed fee arrangement for CM compensation, the reimbursable expenses usually include: A) The costs of all job-site personnel, staff relocation costs, travel and living expenses of jobsite staff. B) The costs of all job-site material, equipment, communications, vehicles, fees paid, reproduction, postage, computer, and any other reasonable field office-related expenses. C) The use of home office personnel who may be involved in purchasing, expediting, scheduling, estimating, or other direct project-related tasks. D) All of the above - ...ANSWER...D) All of the above The fee as a percentage of construction cost method of compensating an agency CM has a tendency to discourage effective time and cost control and is in conflict with the objectives and benefits of an agency construction management. True False - ...ANSWER...True In cases where a project is extended in duration for reasons beyond the control of the CM, it is imperative that the CM agreement address: A) How changes in scope and additional services will be handled. B) Extended CM services. C) The cost of additional services. D) All of the above - ...ANSWER...D) All of the above The cost reimbursement method of compensation is one of the most commonly used forms of CM compensation associated with agency CM. True False - ...ANSWER...True Under a GMP contract, with services provided by a CM-atRisk, which of the following statements is NOT true? A) The GMP is usually established on less than 100% complete drawings and specifications. B) It is important that the phrase Guaranteed Maximum Price be clearly defined in the contract regarding what it includes and excludes. C) With a GMP type CM agreement, the CM is responsible for all costs associated with the project. D) Once a GMP for construction costs is established, the CM takes on the risk for completing the project. - ...ANSWER...C) With a GMP type CM agreement, the CM is responsible for all costs associated with the project. Which of the following methods of compensation for CM services is inconsistent with the CM's agency relationship to its owner? A) Fixed fee B) Percentage of construction costs C) Multiple of direct personnel expenses D) Professional fee plus expenses - ...ANSWER...C) Multiple of direct personnel expenses An agency CM with a fixed fee compensation arrangement shares in the savings generated by a lower than planned construction cost of the project. - ...ANSWER...False It is NOT the purpose of the General Conditions to: A) Clearly define the owner and contractor rights and responsibilities. B) Provide a procedure for executing changes in the work scope in a fair and equitable manner. C) Provide a detailed scope of work. D) Clearly define the roles and responsibilities of the CM - ...ANSWER...C) Provide a detailed scope of work.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

CMIT EXAM NEWEST 2024 ACTUAL EXAM 200
QUESTIONS AND CORRECT DETAILED
ANSWERS (VERIFIED ANSWERS) |ALREADY
GRADED A+




Under a fixed fee approach to agency CM compensation,
which of the following statements is NOT true?
A) The fixed fee approach can have an adverse effect on both
the CM and the owner.
B) Unexpected problems could require a CM to expend more
costs than budgeted for staff to perform tasks.
C) The CM is not expected to perform a greater level of effort
than originally anticipated.
D) Some believe that a temptation always exists for the CM to
put forth less effort than anticipated or actually required. -
...ANSWER...C) The CM is not expected to perform a greater
level of effort than originally anticipated.

The cost plus fixed fee method of CM compensation can be
divided into two separate phases—pre-construction and
construction.
True False - ...ANSWER...True

Under a cost plus fixed fee arrangement for CM
compensation, the reimbursable expenses usually include:
A) The costs of all job-site personnel, staff relocation costs,
travel and living expenses of jobsite staff.
B) The costs of all job-site material, equipment,
communications, vehicles, fees paid, reproduction, postage,

,computer, and any other reasonable field office-related
expenses.
C) The use of home office personnel who may be involved in
purchasing, expediting, scheduling, estimating, or other direct
project-related tasks.
D) All of the above - ...ANSWER...D) All of the above

The fee as a percentage of construction cost method of
compensating an agency CM has a tendency to discourage
effective time and cost control and is in conflict with the
objectives and benefits of an agency construction
management.
True False - ...ANSWER...True

In cases where a project is extended in duration for reasons
beyond the control of the CM, it is imperative that the CM
agreement address:
A) How changes in scope and additional services will be
handled.
B) Extended CM services.
C) The cost of additional services.
D) All of the above - ...ANSWER...D) All of the above

The cost reimbursement method of compensation is one of the
most commonly used forms of CM compensation associated
with agency CM.
True False - ...ANSWER...True

Under a GMP contract, with services provided by a CM-at-
Risk, which of the following statements is NOT true?
A) The GMP is usually established on less than 100%
complete drawings and specifications.

,B) It is important that the phrase Guaranteed Maximum Price
be clearly defined in the contract regarding what it includes
and excludes.
C) With a GMP type CM agreement, the CM is responsible
for all costs associated with the project.
D) Once a GMP for construction costs is established, the CM
takes on the risk for completing the project. - ...ANSWER...C)
With a GMP type CM agreement, the CM is responsible for
all costs associated with the project.


Which of the following methods of compensation for CM
services is inconsistent with the CM's agency relationship to
its owner?
A) Fixed fee
B) Percentage of construction costs
C) Multiple of direct personnel expenses
D) Professional fee plus expenses - ...ANSWER...C) Multiple
of direct personnel expenses

An agency CM with a fixed fee compensation arrangement
shares in the savings generated by a lower than planned
construction cost of the project. - ...ANSWER...False


It is NOT the purpose of the General Conditions to:
A) Clearly define the owner and contractor rights and
responsibilities.
B) Provide a procedure for executing changes in the work
scope in a fair and equitable manner.
C) Provide a detailed scope of work.
D) Clearly define the roles and responsibilities of the CM -
...ANSWER...C) Provide a detailed scope of work.

, The most common basis of CM liability to a trade contractor
with whom the CM has no contractual relationship is
negligent performance of the CM's:
A) Cost estimating
B) Inspection of work
C) Project coordination and scheduling
D) All of the above - ...ANSWER...C) Project coordination
and scheduling

Most publicly funded projects require which of the following
inclusions as part of their contract obligations?
A) BIM model
B) Performance bond
C) Mock-up model
D) LEED Gold - ...ANSWER...B) Performance bond

A Public-Private Partnership (P3) project is usually
considered by a public entity for which of the following
primary reasons:
A) Better design
B) Incorporate environmental requirements
C) Lack of funding
D) Meet sustainability goals - ...ANSWER...C) Lack of
funding

A CM's role and responsibilities are governed solely by the
Owner/CM Agreement.
True False - ...ANSWER...True

There are two basic forms of CM, agency and at-risk. Each
form provides for the basic services of construction

Geschreven voor

Vak

Documentinformatie

Geüpload op
18 april 2024
Aantal pagina's
37
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
ANTONYCARLOS
3.0
(4)

Maak kennis met de verkoper

Seller avatar
ANTONYCARLOS Chamberlain college of nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
6
Lid sinds
2 jaar
Aantal volgers
3
Documenten
82
Laatst verkocht
1 jaar geleden

3.0

4 beoordelingen

5
1
4
0
3
2
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen