1



NABCEP Associate Exam (retake) 106 Questions with Verified
Solutions.
1. UL 1741 - ANS Standards for inverters, converters, controller and
interconnections

2. UL 1703 - ANS Standard for safety, flute plate, Pave modules and panels

3. What PV panels are made from cylindrical silicon ingot - ANS
MONOCRYSTALLINE?

4. Residential Pave systems are limited to no more than 24 two-volt cells connected
in series - ANS 48V in total per NEC 690.71

5. Roof mounted systems are mounted on aluminum or stainless steel rail secured
into the roof trusses using - ANS Lag Bolts

6. Diagnosing a PV problem - ANS Stay safe, look at system first, turn things off
with disconnects, then take measurements

7. PV monitoring systems - ANS consists of a device that measures current and
voltage on ac output of the inviter

8. PV source circuits meets PV output circuits - ANS in the combiner box

9. The point on the IV curve where the MPPT is maximum - ANS is at the third point

10. Current is measured with - ANS millimeter with a clamp

11. ARC flashes inverters are equipped with - ANS arc fault detection

12. NEC - ANS contains which wire to use

13. OSHA - ANS Federal agency that establishes and enforces standards of safety
for the workplace

14. A restaurant uses 2200WH, 48 V dc, 4.9 PSH, and a Battery efficiency of 90%,
what is the Ah capacity needed? - ANS 2200WH/48V = 45.83 AH 45.83AH/.90 =
50.92 50.92/4.9 = 10.39

15. A restaurant uses 2WH and has 10 kWh in storage what can them operation? -
ANS They can operate all operations for days. 10 kWh is a lot of capacity
compared to your usage of 2 WH. First convert 10 kWh to 10,000 Who which is a
lot compared to 2 wh. Refer to section 7.4.0 of your NCCER book for more detail.

16. When you lock out a system you need to use - ANS engraving

17. What was a non-producing financial incentive for installing pave - ANS
REBATES?

18. PV system warranties are for - ANS 25 years

19. What amps would cause an installer if shocked not be able to let go - ANS over
10MA

, 2



22. What needs to be done to PV modules to prevent them from energizing and
causing shock - ANS they need be covered and the leads plugged together

23. Inverters use a digital display to indicate - ANS ambient temperature and voltage
output

24. Ground fault protection - ANS is located in the inverter

25. STC - ANS air mass of less than 1.5 spectral distribution

26. What point on curve has the most MPPT on IV curve - ANS the third point in the
graph?

27. Digital meter with clamp - ANS Ammeter

28. What is the benefit of putting modules on the ground instead of the roof - ANS
they are cooler

29. What is the maintenance required to do on the roof through the life of the system
- ANS replace brackets

30. You need what type of tools to prevent shock - ANS insulated tools

31. Items used for combining the output of grid tied battery inverter - ANS dc
disconnected between array and inverter

32. Diversion charge controller - ANS diverts electricity from fully charged batters to
load

33. Which information is covered in the scope of NEC - ANS national electrical code?

34. In a grid connected system PV array ground fault protection is normally included
as part of the - ANS interactive inverters

35. Which calculation is used to determine the overcurrent protection device installed
in a PV source circuit - ANS ISCx1.25

36. DC disconnect is required - ANS between the array and the inverter

37. AC disconnect is required - ANS between the inverter and the building service
panel

38. Which electrical agency has general authority over PV installation - ANS CITY?

39. To prevent arcing what is the most important measurement to take before
opening a module output connector - ANS voltage

40. Which is a direct effect of using dissimilar metals in a PV racking system - ANS
galvanic corrosion

41. Which of the following is most likely a maintenance item for a PV system in the
first five year following installation - ANS wash pollen or dust off module

42. Which piece of equipment should be installed between a string inverter installed

Geschreven voor

Vak

Documentinformatie

Geüpload op
20 april 2024
Aantal pagina's
5
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$18.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Pronurse pronurse
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
156
Lid sinds
5 jaar
Aantal volgers
141
Documenten
8184
Laatst verkocht
1 maand geleden
NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters

Hello , I am very friendly and experienced tutor dedicated to my teaching work. If you need any kind of help then you can contact me with any questions about your course .I can help you with everything - tests, quizzes, exams, db threads and so on. Just ask me if you want to get an A on your courses.

3.4

33 beoordelingen

5
15
4
3
3
4
2
1
1
10

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen