Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

P370 Final Self-Check Questions With 100% Correct Answers Graded A+

Beoordeling
-
Verkocht
-
Pagina's
4
Cijfer
A+
Geüpload op
20-04-2024
Geschreven in
2023/2024

P370 Final Self-Check Questions With 100% Correct Answers. Converting quarterly and annual business plans into broad output and labor requirements for the intermediate term is known as: Aggregate Planning. Which of the following is NOT a method used in aggregate planning to cope with fluctuations in demand? Construction of a new plant and/or finished goods warehouse. Which aggregate planning strategy typically results in greater inventory carrying costs? Level Strategy. Suppose a company is using pure chase strategy for its aggregate production planning. Which of the following policies would a manager use to deal with (or hedge against) the fluctuation in demand? Hire additional workers when demand increases and outplace them when demand decreases. The Bloomington Bicycle Bearing company wishes to use a level output plan to plan for the rest of the year. Here is the forecasted demand for all bearing types: Month Demand May 800 Jun 650 July 720 August 690 Sept 530 Oct 610 Nov 630 Dec 610 If the beginning inventory is 300 units and the desired ending inventory at the end of December is 500 units, how many units will be in inventory at the end of August? Assume that backorders are allowed. 160. A pure level strategy for aggregate production planning: Maintains a stable workforce working at a constant output rate. Which of the following circumstances would provide an incentive for employing a level (vs. chase) plan? The production process requires highly trained labor. Mole Mfg. has asked you to develop a chase plan for the production of its earth moving equipment. Below is the beginning inventory, monthly demand, and relevant work force information. Determine the total hire/fire costs and the number of workers employed at the end of October. Note: The ending inventory for October should be 0. July Beginning Inventory 1200: Demand is July 3300; Aug 3000; Sept 2550; Oct 2400. Hiring costs $50 per worker; firing costs $100 per worker; production rate 15 units per month per worker; starting workforce 200 workers $13,000 and 160 workers. The BBC Company is forecasting demand to fluctuate over the next four periods. If the beginning inventory level is 120 units and the company wants a pure level output plan, what level of production is required to avoid back orders during any period and to keep ending inventory for period 4 at a minimum? The forecast is: Period 1-1900; Period 2-1930; Period 3-2260; Period 4-910. 1990.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

P370 Final Self-Check Questions With
100% Correct Answers.
Converting quarterly and annual business plans into broad output and labor requirements for the
intermediate term is known as:
Aggregate Planning.


Which of the following is NOT a method used in aggregate planning to cope with fluctuations in
demand?
Construction of a new plant and/or finished goods warehouse.


Which aggregate planning strategy typically results in greater inventory carrying costs?
Level Strategy.


Suppose a company is using pure chase strategy for its aggregate production planning. Which of the
following policies would a manager use to deal with (or hedge against) the fluctuation in demand?
Hire additional workers when demand increases and outplace them when demand decreases.


The Bloomington Bicycle Bearing company wishes to use a level output plan to plan for the rest of the
year. Here is the forecasted demand for all bearing types: Month Demand May 800 Jun 650 July 720
August 690 Sept 530 Oct 610 Nov 630 Dec 610 If the beginning inventory is 300 units and the desired
ending inventory at the end of December is 500 units, how many units will be in inventory at the end
of August? Assume that backorders are allowed.
160.


A pure level strategy for aggregate production planning:
Maintains a stable workforce working at a constant output rate.


Which of the following circumstances would provide an incentive for employing a level (vs. chase)
plan?
The production process requires highly trained labor.


Mole Mfg. has asked you to develop a chase plan for the production of its earth moving equipment.
Below is the beginning inventory, monthly demand, and relevant work force information. Determine
the total hire/fire costs and the number of workers employed at the end of October. Note: The ending
inventory for October should be 0. July Beginning Inventory 1200: Demand is July 3300; Aug 3000;
Sept 2550; Oct 2400. Hiring costs $50 per worker; firing costs $100 per worker; production rate 15
units per month per worker; starting workforce 200 workers
$13,000 and 160 workers.


The BBC Company is forecasting demand to fluctuate over the next four periods. If the beginning
inventory level is 120 units and the company wants a pure level output plan, what level of production
is required to avoid back orders during any period and to keep ending inventory for period 4 at a
minimum? The forecast is: Period 1-1900; Period 2-1930; Period 3-2260; Period 4-910.
1990.

Geschreven voor

Vak

Documentinformatie

Geüpload op
20 april 2024
Aantal pagina's
4
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.29
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
LectDan Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
221
Lid sinds
3 jaar
Aantal volgers
157
Documenten
7985
Laatst verkocht
3 dagen geleden

4.0

48 beoordelingen

5
25
4
12
3
2
2
4
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen