Lead Test – Inspector 100% Solved 2024
Lead Test – Inspector 100% Solved 2024 OSHA lead construction standard - Correct Answer ️️ -29CFR1926.62 What is the ten hour PEL - Correct Answer ️️ -40 mg/m3 (50 x 8 hrs/ hours worked = 400 / 10= 40) What is the OSHA PEL - Correct Answer ️️ -50 mg/m3 TWA What is OSHA Action Level - Correct Answer ️️ -30 mg/ m3 TWA Even after the lead-based paint has been weathered, chipped, peeled, or removed from painted surfaces it can still be available as a potential exposure source through. - Correct Answer ️️ --soil around the house and play area - contaminated dust within the house ( carpet and upholstered furniture) - contaminated dust on paved areas around the house, on sidewalks, alleys, streets and parkinglots HUD requires PHAs and IHAs to inspect what age facilities - Correct Answer ️️ -Pre- 1978 In 1970 the U.S? Surgeon General issued a statement title" Medical Aspects of Children Lead Poisoning, which resulted in Public Law 91-695, the _________________________ in 1971. - Correct Answer ️️ -Lead-Based Paint Poisoning Prevention Act (LBPPPA) Lead exposure in construction- Permissible Exposure Limit (PEL) - Correct Answer ️️ - 50 mg/m3
Written for
- Institution
- EPA - lead paint inspector
- Course
- EPA - lead paint inspector
Document information
- Uploaded on
- April 22, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
lead test inspector 100 solved 2024