DBIA Test 100% VERIFIED SOLUTIONS 2023//2024
Project Delivery System - ANSWER How team members are organized, establishes when parties engage, determines roles of parties, and determines sequence of design, procurement, and construction (db, cmar, dbb) Procurement Method - ANSWER how team members are selected (QBS, best value, low price, sole source) contracting approach - ANSWER how team members are paid (fp, gmp, cost reimbursement, target price, unit price) Design-Bid-Build (DBB) - ANSWER linear, sequential process, A/E selected on qualifications, GC selected on low price, design is fully completed without input from GC, A/E acting in owner's interests, with a historically strong bond, process is wellestablished and understood construction manager at risk - ANSWER similar org structure to DBB, construction manager selected by QBS or best value, contractor provides precon services, negotiated gmp contracting approach, open book estimating process, potential to fast track project, construction cost determined before design completed, potential issues over what is reasonably inferable from gmp design documents Design-Build - ANSWER The owner contracts with one entity (a person or firm) to provide both design and construction services, designer and contractor have a direct contractual relationship, selected by QBS or best value, wide spectrum of contracting approaches and organizational structures, single point responsibility, owner does not manage designer, owner exposure to claims is significantly reduced engineer procure construct (epc) - ANSWER similar to design build, in industrial and power generation sectors, systems and performance testing are central to scope,
Written for
- Institution
- DBIA Te
- Course
- DBIA Te
Document information
- Uploaded on
- April 27, 2024
- Number of pages
- 11
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
dbia test 100 verified solutions 2