Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED

Beoordeling
-
Verkocht
-
Pagina's
34
Cijfer
A+
Geüpload op
29-04-2024
Geschreven in
2023/2024

1 The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - CORRECT ANSWER 10%. HP Code: 14-9.12 3 Who oversees the code for any plumbing installations? - CORRECT ANSWER The NYC Plumbing Code NYC Mech: 1002.1 4 When will anchorage or guides be inspected? - CORRECT ANSWER Annually. NYC Mech: 1210.3.1.2 5 How many brass washout plugs does a miniature boiler have? - CORRECT ANSWER Not less than 3 Brass Washout Plugs 1 inches in size. HP Code 14-11.5 6 How often are high pressure piping expansion joints inspected? - CORRECT ANSWER Weekly RCNY: 20-02 a.2.i (HP steam piping). NYC Mech: 1210.3.1 (hydronics - monthly) 7 How long should a Hydronic System be pressure tested for? - CORRECT ANSWER 2 hours at no less than 100 PSIG. NYC Mech: 1208.1 8 How is a gauge protected from excessive pressure? - CORRECT ANSWER Shut off Cock RCNY: 20-03 c,7 9 Who is authorized in witnessing a test on a gas piping system? - CORRECT ANSWER Plumbing Inspector, Architect, Licensed PE, Master Plumber, or Agency by the D.O.B RCNY 20-01 a,1,2 NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED 10 How should a remote disconnect be labeled? - CORRECT ANSWER Remote control for burner. NYC Mech: 1006.8.1 11 When is a fusible plug not needed to be installed on a boiler? - CORRECT ANSWER Over 200 PSIG. HP Code: 14-10.17, b 12 When shall a power boiler with a MAWP over 400 be tested? - CORRECT ANSWER Pressure tested annually ( safety valve). HP Code: 14-9.7, a,2 13 What shall a Design plan of a boiler and application contain but not limited to? - CORRECT ANSWER Size + Location, Operating Pressure + Temperature of the Pressure vessel, and Type + Specification of Pressure Relief. 14 Who is responsible for maintaining the copies of the certified welder qualifications report? - CORRECT ANSWER Copies of the certified welder qualification report she'll be maintained by the responsible WELDING AGENCY and the company performing the welding, and shall be made available upon request to the DOB. RCNY: 20-02, b,2v,/22-01,d,5. HP Code: 14-3.7 15 Who needs to furnish a control diagram and boiler operation instructions? - CORRECT ANSWER The Installer. NYC Mech: 1004.7 16 Who will certify and calibrate all gauges utilized for testing? - CORRECT ANSWER All gauges utilized for testing shall be calibrated and certified annually in accordance with ASME B40.100 by the test operathor. NYC Mech: 1011.2

Meer zien Lees minder
Instelling
NYC HIGH PRESSURE STEAM
Vak
NYC HIGH PRESSURE STEAM

Voorbeeld van de inhoud

NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED 1 The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - CORRECT ANSWER 10%. HP Code: 14 -9.12 3 Who oversees the code for any plumbing installations? - CORRECT ANSWER The NYC Plumbing Code NYC Mech: 1002.1 4 When will anchorage or guides be inspected? - CORRECT ANSWER Annually. NYC Mech: 1210.3.1.2 5 How many brass washout plugs does a miniature boiler have? - CORRECT ANSWER Not less than 3 Brass Washout Plugs 1 inches in size. HP Code 14 -11.5 6 How often are high pressure piping expansion joints inspected? - CORRECT ANSWER Weekly RCNY: 20 -02 a.2.i (HP steam piping). NYC Mech: 1210.3.1 (hydronics - monthly) 7 How long should a Hydronic System be pressure tested for? - CORRECT ANSWER 2 hours at no less than 100 PSIG. NYC Mech: 1208.1 8 How is a gauge protected from excessive pressure? - CORRECT ANSWER Shut off Cock RCNY: 20 -03 c,7 9 Who is authorized in witnessing a test on a gas piping system? - CORRECT ANSWER Plumbing Inspector, Architect, Licensed PE, Master Plumber, or Agency by the D.O.B RCNY 20 -01 a,1,2 NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED 10 How should a remote disconnect be labeled? - CORRECT ANSWER Remote control for burner. NYC Mech: 1006.8.1 11 When is a fusible plug not needed to be installed on a boiler? - CORRECT ANSWER Over 200 PSIG. HP Code: 14 -10.17, b 12 When shall a power boiler with a MAWP over 400 be tested? - CORRECT ANSWER Pressure tested annually ( safety valve). HP Code: 14 -9.7, a,2 13 What shall a Design plan of a boiler and application contain but not limited to? - CORRECT ANSWER Size + Location, Operating Pressure + Temperature of the Pressure vessel, and Type + Specification of Pressure Relief. 14 Who is responsible for maintaining the copies of the certified welder qualifications report? - CORRECT ANSWER Copies of the certified welder qualification report she'll be maintained by the responsible WELDING AGENCY and the company performing th e welding, and shall be made available upon request to the DOB. RCNY: 20-02, b,2v,/22 -01,d,5. HP Code: 14 -3.7 15 Who needs to furnish a control diagram and boiler operation instructions? - CORRECT ANSWER The Installer. NYC Mech: 1004.7 16 Who will certify and calibrate all gauges utilized for testing? - CORRECT ANSWER All gauges utilized for testing shall be calibrated and certified annually in accordance with ASME B40.100 by the test operathor. NYC Mech: 1011.2 NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED 17 What shall be placed in between different joints and piping material? - CORRECT ANSWER An approved Adapter Fitting NYC Mech: 1203.1.2 18 What items are exempt from the reporting requirements? - CORRECT ANSWER Exemptions: (1) the installation of backing rings in handhole or manhole openings or the building up of same; and (2) the seal welding of tubes to the tube sheet. HP Code: 14 -3.4, b, 1-2 19. Who will be under control for any welding done to a High -pressure tank? - CORRECT ANSWER The welding shall be under controlled inspection of an ENGINEER, supervising a welding inspection agency acceptable to the DOB RCNY: 22 -
01 d,2 20 At what pressure is it required to have extra heavy valves installed? - CORRECT ANSWER HP Code: 14 -10.21b / 14 -9.2,b 21 The -------------- files an application for a boiler alteration - CORRECT ANSWER Inspector HP Code: 14 -3.3 c, 2, ii 22 How many safety valves does a boiler have with over 500 square feet of heating surface? - CORRECT ANSWER At least 2 HP Code: 14 -9.4a 23 Gas fired Boilers not exceeding 100 square feet of heating surface shall de provided with a ? - CORRECT ANSWER Single or Double Cone type of Hood Diverter in the stack HP Code: 14 -6.2 NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED 24 A heater for either liquid fuels or other liquids harmful to the boiler shall not be installed? - CORRECT ANSWER Directly in the steam or water space within a boiler. HP Code: 14 -5.1 25 Who is responsible for any spatial relationship between tanks and gas services? - CORRECT ANSWER The Installer of the last installation to correct the violation. RCNY: 22 -01, c,3 Who is responsible for the setting of operating and safety controls? - CORRECT ANSWER The Installing Company NYC Mech: 1004.7 27 With what safety fitting shall you protect High Pressure Steam and Water boilers with? - CORRECT ANSWER DUAL Low Water Cut Outs. NYC Mech: 1007.1. HP Code: 14 - 1. 14, a 28 Spring loaded safety valves have a total combined relieve capacity of? - CORRECT ANSWER 100% of the Max Designed Capacity of the Boiler. HP Code: 14 -9.5, b 29 What is the total combined relieving capacity of power actuated relieving valves? - CORRECT ANSWER NO LESS THAN 10% of the MAWP or NO HIGHER THAN 20% ABOVE the MAWP. HP Code: 14 -9.5, a, b 30 What is the minimum blowdown for a spring -loaded safety valve? - CORRECT ANSWER 2%. HP Code: 14 -9.12

Geschreven voor

Instelling
NYC HIGH PRESSURE STEAM
Vak
NYC HIGH PRESSURE STEAM

Documentinformatie

Geüpload op
29 april 2024
Aantal pagina's
34
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Courseinstructor Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
130
Lid sinds
2 jaar
Aantal volgers
61
Documenten
1996
Laatst verkocht
6 dagen geleden
Doctor HannahGray

Hello, I offer  professional nursing specializations and other study guides. My documents are 100% guaranteed to help you Ace in your studies. My purpose is to empower and encourage you in your course work. Don't be afraid to contact me; I'm a pleasant person. Very good fortune

4.5

26 beoordelingen

5
18
4
4
3
2
2
2
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen