SWPPP Walmart Stormwater Exam Questions And Answers | Latest Update 2024 | Graded A+
SWPPP Walmart Stormwater Exam Questions And Answers | Latest Update 2024 | Graded A+. The 1970s law that set into place the regulation of stormwater is - Answer :The clean water act Quiz :Requirements for managing stormwater activity on a construction site are outlined in the following regulation - Answer :NPDES Quiz :Which of the following is never an allowable stormwater discharge from a construction site - Answer :Discharge from contaminated ground water Quiz :The notice of termination can be filed when - Answer :All construction activity, inside and outside of the building, is complete and permanent stabilization has been verified as adequate to meet permit requirements Quiz :Relative to stormwater permitting all of the following must occur before construction starts except - Answer :Submit the notice of termination (NOT) Quiz :The stormwater notice of intent (NOI) must be submitted - Answer :After the SWPPP is prepared and before starting construction Quiz :Potential pollutant sources stored on a construction site may include - Answer :1. Petroleum storage tanks 2. Soil sediments 3. Masonary material 4. ALL OF THE ABOVE Quiz :The SWPPP inflammation sequence may be modified - Answer :After consulting with the project SWPPP Designer (CEC) and, if required, the project owner and receiving written approval Quiz :A SWPPP site map will show all of the following except - Answer :Notices of violation Quiz :Which of the following information is to be posted at the entrance of the site - Answer :1. Construction site notice 2. Permit authorization 3. Location of SWPP 4. ALL OF THE ABOVE SWPPP Walmart Stormwater Exam Questions And Answers | Latest Update 2024 | Graded A+ Quiz :Which of the following is NOT A beneficial use of water - Answer :Flushing a spill down a storm drain Quiz :When installing and maintaining a check dam make sure - Answer :The low point (overflow) of the check dam is in the middle of the channel Quiz :To reduce the possibility of undercutting in channels, you should - Answer :Install filter fabric under rock and similar materials placed within the stormwater conveyance Quiz :The good housekeeping section of the SWPP must include all BUT which of the following - Answer :Post construction stormwater management procedures Quiz :Runoff controls include all but which of the following - Answer :Rolled erosion control products Quiz :Which erosion control best management practice increases water filtration, dissipates rainfall energy and slows over flow of stormwater - Answer :Vegetation Quiz :Of the following factors that influence erosion rates, the one a contractor has the most control over (only select one) is - Answer :Groundcover Quiz :Temporary stabilization should be implemented - Answer :Immediately on all disturbed areas that are likely to or will remain inactive for 14-days or more Quiz :The primary purpose of a construction exit is - Answer :To remove sediment from construction site vehicles and minimize trackout Quiz :Common types of erosion include all of the following except - Answer :Sedimentation Quiz :Proper spill management should include all of the following EXCEPT - Answer :Installation of a spill pit on your construction site Quiz :The best location for portable toilets on your construction site is - Answer :On ground level, in low construction traffic areas
Written for
- Institution
- SWPPP Walmart Stormwater
- Course
- SWPPP Walmart Stormwater
Document information
- Uploaded on
- April 29, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
swppp walmart stormwater
-
swppp
-
walmart stormwater
-
latest update 2024
-
graded
-
verified answers
-
swppp walmart stormwater questions and answers