Study review for BECC MOD 4 exam Guide
Study review for BECC MOD 4 exam Guide What fittings are secured for CBR defense? - CORRECT ANSWER-Circle William What condition of readiness is used when the ship is in NO danger? - CORRECT ANSWER-X-ray The maximum length of time that a fitting may be logged open is ....... - CORRECT ANSWER-24 hours. The backbone of a ship is referred to as the ....... - CORRECT ANSWER-keel. Compartments located completely on the Starboard side of the centerline are assigned ....... numbers as the third digit in a compartment number. - CORRECT ANSWER-odd The lettering on a compartment BULL'S EYE is ....... inches tall? - CORRECT ANSWER-2 Primary monitoring of the firemain system is conducted from ....... - CORRECT ANSWER-Damage Control Central Which type of fire main system is located near the centerline of the ship that extends forward and aft on the damage control deck to supply the required fire main services? - CORRECT ANSWER-Single Main What is the proper sequence to align an installed eductor for operation? - CORRECT ANSWER-Discharge valve, fire main actuation valve, bilge suction valve Which drainage system runs through the main machinery spaces on a Navy ship? - CORRECT ANSWER-Main (True/False) To prevent possible flooding in the compartment, the bilge suctions must be closed at all times when NOT in use. - CORRECT ANSWER-True The team responsible for exposed ordinance is the ....... team. - CORRECT ANSWEROrdinance Disposal (True/False) The team that handles all damage caused by collisions is the Crash and Salvage Team. - CORRECT ANSWER-False Removal of water from flooded compartments, is the responsibility of the ___ team - CORRECT ANSWER-De watering In the event that Damage Control Central is lost due to battle damage, which repair party would assume the duties as back up Damage Control Central? - CORRECT ANSWER-Most remote repair locker (True/False) The Damage Control Repair Station responsible for re-manning the main space(s) is Repair Five. - CORRECT ANSWER-True The Main Deck Repair party is repair ....... - CORRECT ANSWER-1. Which Damage Control party is only on air capable ships? - CORRECT ANSWERCrash and Salvage Team The person that is in charge of clearing routes to provide access to fires is the ....... - CORRECT ANSWER-Access Man. Who sets and maintains the boundaries, and removes and relocates flammables? - CORRECT ANSWER-Boundary man "Unexploded munitions" signs will be found in the ....... repair locker kit? - CORRECT ANSWER-CBR Monitoring (True/False) The extra plugging and patching repair kits are inventoried and maintained by the personnel assigned to the engineering spaces. - CORRECT ANSWER-True Freeboard is a measurement of distance from the ....... - CORRECT ANSWER-waterline to the main deck Roll - CORRECT ANSWER-Port to starboard (True/False) Investigators must use message blanks to writ
Written for
- Institution
- BECC
- Course
- BECC
Document information
- Uploaded on
- May 2, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
study review for becc mod 4 exam guide
-
what fittings are secured for cbr defense
-
which damage control party is only on air capable
-
what holds the pecu rod in the torch assembly
Also available in package deal