ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS | LATEST UPDATED 2024/2025 | SCORED A+
The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - Correct Answer - 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - Correct Answer - 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - Correct Answer - Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - Correct Answer - True The temperature of concrete may be measured in a wall form. True of False - Correct Answer - True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - Correct Answer - False What must be done to the sample container prior to sampling the concrete? - Correct Answer - Dampen (with water) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - Correct Answer - Gently press the concrete around the temperature measuring device at the surface of the concrete How long must the temperature measuring device remain in the freshly mixed concrete? - Correct Answer - At least 2 minutes but not more than 5 minutes ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS | LATEST UPDATED 2024/2025 | SCORED A+ After the temperature of the concrete is read, what is required? - Correct Answer - Reporting of temperature The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - Correct Answer - 1 degree F [0.5 C] According to ASTM C1064, what is one reason to take the temperature of concrete? - Correct Answer - Verify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - Correct Answer - False The sample of concrete used for temperature determination must be rodded 25 times. True or False? - Correct Answer - False Sampling by this method is required when tests are to be made to determine _____ with specification requirements. - Correct Answer - Compliance This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. - Correct Answer - Stationary mixers, paving mixers, revolving drum mixers, and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - Correct Answer - 15 Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - Correct Answer - True The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - Correct Answer - 5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - Correct Answer - 15 The concrete sample must be protected from contamination and _____. - Correct Answer - Rapid evaporation The minimum size sample for making strength test specimens is _____. - Correct Answer - 28 L (1ft^3) When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - Correct Answer - 2 The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - Correct Answer - 5 When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch. - Correct Answer - 2 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - Correct Answer - False The composite samples from a truck mixer must be obtained from the _____ portion of the batch. - Correct Answer - Middle When the concrete contains aggregate larger than that permitted for a particular test method, the sample of concrete must be _____ _____ before making the test. - Correct Answer - Wet sieved The slump test is applicable to plastic concrete with a maximum size aggregate of _____. - Correct Answer - 1.5 in. [37.5 mm] When the concrete contains aggregate larger than allowed for the slump test, the large aggregate must be _____. - Correct Answer - Removed by wet sieving the sample over 1.5 in. [37.5 mm] sieve The mold for making the slump test is in the shape of _____. - Correct Answer - The frustum of a cone The height of the slump mold is _____. - Correct Answer - 12 in. [300 mm] The interior surface of the slump mold is allowed to have minor irregularities. True or False? - Correct Answer - False For use in the slump test, the end or both ends of the tamping rod must be _____. - Correct Answer - Rounded to a hemispherical tip The sample of concrete for use in making the slump test must be obained in accordance with ASTM Standard _____. - Correct Answer - C172, Standard Practice for Sampling Freshly Mixed Concrete The slump mold should be in a dry condition before beginning the test. True or False? - Correct Answer - False The surface on which the slump mold will be placed must be _____. - Correct Answer - Flat, level, moist, nonabsorbent, and free of vibration The slump mold is filled in _____ layers. - Correct Answer - 3 Each layer should fill approximately _____ the volume of the mold. - Correct Answer - One-third The approximate concrete depth (in verticle distance) after placing the first layer is _____, and the second layer is _____. - Correct Answer - 2 5/8 in. [70 mm], 6 1/8 in. [160 mm] What is the specified number of roddings for each layer? - Correct Answer - 25 How deep should the tamping rod penetrate into each layer? - Correct Answer - Rod each layer throughout its depth; on the second and final layers, the rod should penetrate into the previous layer approximately 1 in. [25 mm] When rodding the bottom layer, the tamping rod must be _____ to uniformly distribute the strokes. - Correct Answer - Slightly inclined What must be done if the concrete drops below the top of the slump mold while the top layer is being rodded? - Correct Answer - Add additional concrete to keep an excess of concrete above the top of the mold at all times Prior to lifting the mold, concrete must be removed from _____. - Correct Answer - The area surrounding the base of the mold After the final rodding, the sides of the slump mold should should be tapped lightly with the tamping rod. True or False? - Correct Answer - False When raising the slump mold, it should not be rotated or twisted, True or False? - Correct Answer - True How much time is allowed for lifting the slump mold? - Correct Answer - 5 +- 2 seconds The measurement for slump is made from the top of the mold to what point of the concrete specimen? - Correct Answer - The displaced original center of the top surface of the specimen
Geschreven voor
- Instelling
- ACI CONCRETE FIELD TESTING TECHNICIAN
- Vak
- ACI CONCRETE FIELD TESTING TECHNICIAN
Documentinformatie
- Geüpload op
- 3 mei 2024
- Aantal pagina's
- 11
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
aci
-
latest updated 2024
-
graded
-
verified answers
-
aci concrete field testing technician
-
concrete field testing technician
-
aci exam questions and answers
Ook beschikbaar in voordeelbundel