Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

WARRANT BOARD EXAM|COMPLETE QUESTIONS WITH A+ GRADED ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
3
Cijfer
A+
Geüpload op
05-05-2024
Geschreven in
2023/2024

WARRANT BOARD EXAM|COMPLETE QUESTIONS WITH A+ GRADED ANSWERS When would you use a Time-and-materials (T&M) contract? Why is it the least preferred? (far 16.601) - Use a T&M contract only when no other contract type is suitable. - Use when you cannot accurately estimate the extent or duration of the work or anticipated costs with a reasonable degree of confidence. - A D&F is required. When would you use a Time-and-materials (T&M) contract? Why is it the least preferred? (far 16.601) part 2 of question - Pros: T&M contracts can be more flexible & more expedient than other types of contracts. Flexibility may be required if the task cannot be fully defined. When would you use a Time-and-materials (T&M) contract? Why is it the least preferred? (far 16.601) part 3 of question - T&M contracts are the least preferred because of the amount of high amount of risk placed on the Government. - The amount of profit paid to the Contractor is tied to the number of hours worked. There is no incentive for the Contractor to control costs or hours. The Government bears the risk of cost overruns. - Requires close surveillance by the Government. - Should include a ceiling price that the contractor exceeds at its own risk Factors to consider in selecting Contract Type: part 1 - Level of Competition - Price analysis (Degree to which price analysis can provide a realistic pricing) Factors to consider in selecting Contract Type: part 2 - Cost analysis (In the absence of effective price competition and if price analysis is not sufficient, the cost estimates of the offeror and the Government provide the bases for negotiating contract pricing arrangements. It is essential that the uncertainties involved in performance and their possible impact upon costs be identified and evaluated, so that a contract type that places a reasonable degree of cost responsibility upon the contractor can be negotiated.) Factors to consider in selecting Contract Type: part 3 - Type/Complexity of requirement (Complex requirements, particularly those unique to the Government, usually result in greater risk assumption by the Government. As a requirement recurs or as quantity production begins, the cost risk should shift to the contractor, and a fixed-price contract should be considered.) Factors to consider in selecting Contract Type: part 4 - Urgency

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

WARRANT BOARD EXAM|COMPLETE
QUESTIONS WITH A+ GRADED ANSWERS
When would you use a Time-and-materials (T&M) contract? Why is it the least preferred? (far 16.601)
- Use a T&M contract only when no other contract type is suitable.

- Use when you cannot accurately estimate the extent or duration of the work or anticipated costs
with a reasonable degree of confidence.

- A D&F is required.


When would you use a Time-and-materials (T&M) contract? Why is it the least preferred? (far 16.601)
part 2 of question
- Pros: T&M contracts can be more flexible & more expedient than other types of contracts.

Flexibility may be required if the task cannot be fully defined.


When would you use a Time-and-materials (T&M) contract? Why is it the least preferred? (far 16.601)
part 3 of question
- T&M contracts are the least preferred because of the amount of high amount of risk placed on the
Government.

- The amount of profit paid to the Contractor is tied to the number of hours worked. There is no
incentive for the Contractor to control costs or hours. The Government bears the risk of cost
overruns.

- Requires close surveillance by the Government.
- Should include a ceiling price that the contractor exceeds at its own risk


Factors to consider in selecting Contract Type: part 1
- Level of Competition

- Price analysis (Degree to which price analysis can provide a realistic pricing)


Factors to consider in selecting Contract Type: part 2
- Cost analysis
(In the absence of effective price competition and if price analysis is not sufficient, the cost estimates
of the offeror and the Government provide the bases for negotiating contract pricing arrangements. It
is essential that the uncertainties involved in performance and their possible impact upon costs be
identified and evaluated, so that a contract type that places a reasonable degree of cost responsibility
upon the contractor can be negotiated.)


Factors to consider in selecting Contract Type: part 3
- Type/Complexity of requirement
(Complex requirements, particularly those unique to the Government, usually result in greater risk
assumption by the Government. As a requirement recurs or as quantity production begins, the cost
risk should shift to the contractor, and a fixed-price contract should be considered.)


Factors to consider in selecting Contract Type: part 4
- Urgency

Geschreven voor

Vak

Documentinformatie

Geüpload op
5 mei 2024
Aantal pagina's
3
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.89
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EXAMSMART Howard Community College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
10
Lid sinds
2 jaar
Aantal volgers
2
Documenten
2992
Laatst verkocht
1 maand geleden
SMART.SCORES

On this page, you find all documents, package deals, and flashcards offered by seller LectJoshua.

5.0

2 beoordelingen

5
2
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen