Pro Tools Tier 4 Post Test Questions with 100% Correct Answers | Verified | Latest Update |100% Solved
What 4 pieces of AVID hardware are needed for a satellite? - - Pro Tools HD rig - AVID sync HD interface - Video monitors - Another Pro Tools system What 3 physical connections are needed for a satellite? - - CAT5 or CAT6 cable with an RJ-45 connection - Blackburst or tri-level sync connection - A video connection (HDMI, Composite, etc) What kind of cable and wiring is needed for a computer connecting through a router or switch to another computer? - CAT5 or CAT6, Straight-through What is needed to send video to TV monitors in the studio or control room? - An HDMI splitter What 4 things should all Pro Tools rigs share? - - Same timecode frame rate - Same format (PAL, NTSC...)
Written for
- Institution
- Pro Tools Tier 4
- Course
- Pro Tools Tier 4
Document information
- Uploaded on
- May 7, 2024
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pro tools tier 4 post test questions