Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED WITH RATIONALES UPDATED 2024 | GRADED A

Rating
5.0
(2)
Sold
1
Pages
24
Grade
A+
Uploaded on
07-05-2024
Written in
2023/2024

IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED WITH RATIONALES UPDATED 2024 | GRADED A IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED WITH RATIONALES UPDATED 2024 | GRADED A IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED WITH RATIONALES UPDATED 2024 | GRADED A

Show more Read less
Institution
Course

Content preview

IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS
AND ANSWERS VERIFIED WITH RATIONALES UPDATED
2024 | GRADED A

If an organization has narrowed the list of contractors submitting
proposals but is still having trouble deciding between them, what could
help? - CORRECT ANSWER The correct answer is: Bidder
presentations

Which statement is true of the Execute, Monitor and Control phases of the
project model? - CORRECT ANSWER The correct answer is: These
phases are often concurrently or iteratively performed.

When project managers determine the level of data to collect for
monitoring and controlling project work, what do they not need to
verify? - CORRECT ANSWER The correct answer is: Project work
delays due to data collection are scheduled.

What do project managers submit when they suggest revising the
project management plan to make it feasible given the current
situation? - CORRECT ANSWER The correct answer is: change
order.

What is developed to review a final deliverable from an entire
system perspective? - CORRECT ANSWER The correct
answer is: Checklist reviews

Which statement is true about the documentation for project closure? -
CORRECT ANSWER The correct answer is: Documentation may
include operations and maintenance manuals.

A project manager wants to minimize risk and provide some
independent checks and balances on contractor work. Which contract
model should the organization use? - CORRECT ANSWER
Construction management Your answer is correct.

Construction management is the best choice because it uses an
independent consultant to supervise separate contracts with design
firms and construction firms, which allows for some independent
review. (Reference: 3-2-10)

, IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS
AND ANSWERS VERIFIED WITH RATIONALES UPDATED
2024 | GRADED A


According to the critical path method (CPM) of scheduling, what is the
critical path for any project? - CORRECT ANSWER the longest set of
sequential tasks in the project. Your answer is correct.

The critical path is the longest set of sequential tasks in a project and
indicates the shortest possible project duration. The critical path is
determined using forward pass scheduling followed by backward pass
scheduling.(Reference: 3-2-3)

, IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS
AND ANSWERS VERIFIED WITH RATIONALES UPDATED
2024 | GRADED A

Why does a budget need to be closely integrated with the project
schedule? - CORRECT ANSWER costs are allocated to the period in
which they occur. Your answer is correct.

Development of the budget requires close integration with the project
schedule because costs are allocated to the period in which the costs are
incurred. Similarly, budget constraints can require changes to the
project schedule such as completing a task more quickly to minimize
financing costs. Budgets are produced after schedules. Estimates for
costs are made during planning rather than waiting until
later.(Reference: 3-2-5)

Which scheduling methods are for activities NOT concurrently
performed? - CORRECT ANSWER Traditional waterfall model
scheduling Your answer is correct.

In forward pass, backward pass, and critical pass scheduling, as many
activities as possible are concurrently performed, constrained by
resource availability and predecessors. The traditional waterfall model
does not include these time-saving processes, and therefore it is rarely
used for project scheduling.(Reference: 3-2-3)

Which statement is true about the process steps used to build a project
schedule? - CORRECT ANSWER Failure to agree on a duration
estimate may indicate a need for further task division. Your answer is
correct.

Failure to come to agreement on an estimate may indicate the task
needs to be further broken down. Dependencies are part of sequencing.
Knowing the skill levels of personnel affects the length of time required
for a task, so determining this is necessary. Sequencing is not
performed during work breakdown structure creation. (Reference: 3-2-
3)

Which statement is true of communications management for an office
relocation? - CORRECT ANSWER Post-relocation orientation brochures

Written for

Course

Document information

Uploaded on
May 7, 2024
Number of pages
24
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$22.98
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Reviews from verified buyers

Showing all 2 reviews
7 months ago

1 year ago

This made me pass my test ,,,,,,i appreciate the document

5.0

2 reviews

5
2
4
0
3
0
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ERICPinchus Walden University
Follow You need to be logged in order to follow users or courses
Sold
159
Member since
3 year
Number of followers
85
Documents
2437
Last sold
4 weeks ago
Perfect Expert Scores

Welcome to my all inclusive store. Get all quality study materials at a cost-effective price. Hello! I'm Prof Eric, and I specialize in a diverse range of subjects including Health Care, Nursing, History, Mathematics, Psychology, and Biology. With a commitment to academic excellence, my work includes meticulously updated exam solutions and study materials designed to help you succeed. Why Choose My Documents: 1.Expertise Across Disciplines: Whether you need help with complex biology concepts, nursing fundamentals, historical analysis, mathematical problems, psychological theories, or healthcare insights, I've got you covered. 2.Updated Exam Solutions: My materials are regularly refreshed to ensure you have the most current and relevant information for your exams. 3.Detailed and Clear: Each document is crafted with precision to provide clarity and ease of understanding, making your study sessions more productive. Welcome to my all inclusive store.Get all quality study materials at a cost-effective price EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A. I ensure scholarly standards in my documents and that's why i'm one of the BEST GOLD RATED TUTORS in Stuvia. I assure a GOOD GRADE if you will use my work.

Read more Read less
4.6

317 reviews

5
223
4
65
3
20
2
5
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions