Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ACI Concrete Field Testing Technician- Grade I Exam|Complete with A+ Graded Answers

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
10-05-2024
Written in
2023/2024

ACI Concrete Field Testing Technician- Grade I Exam|Complete with A+ Graded Answers The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of __mm [__in.] into the freshly mixed concrete. 77mm /3in. The temperature measuring device shall be capable of accurately measuring the temperature of freshly mixed concrete to +- __C [+__F] throught a range of __. 0.5 C / +-1F / 0-50 Decrees C The temp. measuring device shall be verified __, or whenever there is a question of __. Annually / accuracy The temp of concrete may be measured in a wheelbarrow? T/F True The temp. of concrete may be measured in a wall form. T/F True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temp. T/F False What must be done to the sample container prior to sampling the concrete It must be dampened with water What must be done to the concrete surrounding the temp measuring device after the device is submerged in the fresh concrete? Gently press the concrete at the surface around the measuring device. How long must the temperature measuring device remain in the freshly mixed concrete? At least 2 min., no longer than 5 min. After the temperature of the concrete is read, what is then required? Reporting of temp. The temp. of concrete is reported to the nearest __. 1 degree F According to ASTM C1064, what is one reason to take the temperature of concrete? to verify conformance to a specific requirement. A max. temp. of freshly mixed concrete is specified in ASTM C1064. T/F False The sample of concrete used for temperature determination must be rodded 25 times. False Sampling by this method covers procedures or obtaining representative samples, on which test are to be performed to determined __ with quality requirements of the specifications under which the concrete is furnished. Compliance This method covers sampling from four types of mixers, which are __, __, __, and __. Stationary mixers / Paving mixers / revolving drum mixers / open top mixers The elapsed time between obtaining the first and final portions of a composite sample shall not exceed __ min. 15 min. Portions of a composite sample shall be thoroughly mixed before beginning test on the sample. T/F True Start tests for slump, temp, and air content within __ min. after obtaining the final portion of the composite sample. 5 min. start molding specimens fr strength tests within __ after fabrication the composite sample. 15 min. The concrete sample must be protected from contamination and __. Rapid evaporation The maximum size sample for making strength test specimens is __ ft cubed 1 foot cubed. When sampling from a STATIONARY mixer, the batch must be sampled at __ or more regularly spaced intervals during discharge of the middle portion of the batch. 2 When sampling from a PAVING mixer, obtain samples from at least __ different portions of the pile and combine them into one composite sample for test purposes 5 When sampling from a REVOLVING DRUM TRUCK mixer, sample the concrete by collecting __ or more portions taken at regularly spaced intervals during discharge of the middle portion of the batch. 2

Show more Read less
Institution
Course

Content preview

ACI Concrete Field Testing Technician- Grade I
Exam|Complete with A+ Graded Answers
The sensor of the temperature measuring device shall be submerged a minimum of _____ in.
[_____mm] into the freshly mixed concrete.
3 in. [75 mm]


The temperature measuring device shall have a capacity of measuring temperature of freshly mixed
concrete to +- _____ degrees F [+- _____ C] throughout a range of _____.
1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C]


The temperature measuring device shall be calibrated _____, or whenever there is a question of
_____.
Annually, accuracy


The temperature of concrete may be measured in a wheelbarrow. True or False?
True


The temperature of concrete may be measured in a wall form. True of False
True


A composite sample of concrete is required even if the only purpose for obtaining the sample is to
determine temperature. True of False?
False


What must be done to the sample container prior to sampling the concrete?
Dampen (with water)


What must be done to the concrete surrounding the temperature measuring device after the device is
submerged in the fresh concrete.
Gently press the concrete around the temperature measuring device at the surface of the concrete


How long must the temperature measuring device remain in the freshly mixed concrete?
At least 2 minutes but not more than 5 minutes


After the temperature of the concrete is read, what is required?
Reporting of temperature


The temperature of concrete is reported to the nearest _____ degrees F [_____ C]
1 degree F [0.5 C]


According to ASTM C1064, what is one reason to take the temperature of concrete?
Verify conformance to a specified requirement for temperature of concrete


A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False?

, False


The sample of concrete used for temperature determination must be rodded 25 times. True or False?
False


Sampling by this method is required when tests are to be made to determine _____ with specification
requirements.
Compliance


This method covers sampling from four types of mixtures which are _____, _____, _____, and _____.
Stationary mixers, paving mixers, revolving drum mixers, and open top mixers


The maximum allowable time between obtaining the first and final portions of a composite sample is
_____ minutes.
15


Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample.
True of False?
True


The maximum elapsed time allowed between obtaining the final portion of the composite sample and
beginning the tests for slump, temperature, and air content is _____ minutes.
5


The molding of strength test specimens shall begin within _____ minutes after fabricating the
composite sample.
15


The concrete sample must be protected from contamination and _____.
Rapid evaporation


The minimum size sample for making strength test specimens is _____.
28 L (1ft^3)


When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly
spaced intervals during discharge of the middle portion of the batch
2


The composite sample for a paving mixer must represent a minimum of _____ different portions of
the batch of concrete taken from the pile after discharge.
5


When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____
regularly spaced intervals during discharge of the middle portion of this batch.
2

Written for

Course

Document information

Uploaded on
May 10, 2024
Number of pages
12
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.59
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LectDeniz Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
21
Member since
2 year
Number of followers
13
Documents
4965
Last sold
7 months ago
Lect Deniz Academic Resources Hub

Lect Deniz is a highly experienced academic tutor and dedicated content creator with a strong track record of developing comprehensive, high-quality study materials for a wide range of university courses across the globe. With years of experience in higher education support, he excels at transforming complex academic concepts into clear, structured, and easy-to-follow resources that enhance student understanding and confidence. He provides an extensive collection of well-researched and carefully organized documents across key disciplines, including nursing, medicine, and various science fields. His materials cover essential topics such as anatomy, physiology, pharmacology, clinical practice, and core scientific principles, making them highly valuable for both coursework and intensive exam preparation. Each document is thoughtfully designed to align with university standards and curricula, ensuring accuracy, relevance, and practical application. Lect Aziim’s work stands out for its clarity, depth, and attention to detail, offering students concise summaries, detailed explanations, and exam-focused content that supports effective revision. His commitment to academic excellence and student success is reflected in the consistency and reliability of his materials, making him a trusted resource for learners seeking to improve performance and achieve their academic goals.

Read more Read less
5.0

1 reviews

5
1
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions