Fundamentals of Integrated Project Delivery Proctored Exam Questions Fully Answered Graded A+/2024.
3 main components - correct answer 1. Project Delivery System Selection 2. Procurement Method Selection 3. Contract Format Selection Key phases of project delivery - correct answer 1. Master Builder (Renaissance) 2. Separation (Industrial Revolution) 3. Integration (Information Age) Code of Hammurabi - correct answer Obligation of design & construction to society Earliest recorded business codes were introduced by? - correct answer Hammurabi From the 15th century into the 19th century who retained responsibility for both design and construction - correct answer The architect When was the American Society of Civil Engineers (ASCE) established? - correct answer Established in 1852 Oldest professional society? - correct answer ASCE Effects of the industrial revolution? - correct answer - Task Specialization - Ability to communicate design intent - Division of Labor - Entrepreneurship - Need for capital When was Design Build Institute of America (DBIA) founded? - correct answer Founded in 1993 Purpose of Design Build Institute of America (DBIA)? - correct answer Was meant to help standardize and advocate for an already emerging design-build industry Delivery methods? - correct answer - DBB = Design Bid Build - MP = Multiple Prime - CM@R = Construction Management at Risk - DB = Design Build - IPD = Integrated project delivery Importance of Project Delivery Methods - correct answer Establishes when the parties become engaged Three main parties involved in the project delivery process: - correct answer o Owner o Designer o Contractor Key Issue of Design-Bid-Build (DBB) - correct answer Key issue is two separate contracts Who is responsible for risk and liability in DBB? - correct answer Risk and liability are on the owner Challenge of Multiple Prime (MP)? - correct answer Challenge is owner engagemen
Written for
- Institution
- DBIA.
- Course
- DBIA.
Document information
- Uploaded on
- May 11, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
fundamentals of integrated project delivery
Also available in package deal