CMGT 360 Final (Exam 3) Questions And Answers Well Elaborated/2024.
Design-Build - correct answer a method of project delivery in which one entity (design-builder) forges a single contract with the Owner to provide for architectural engineering design services and construction services Design-Build Entity Configurations - correct answer • Contractor Led • A/E Led • Integrated Firm • Developer Led • Joint Venture Competitive Solicitation & Basis of Award (Design-Bid-Build) - correct answer IFB = Low Bid (quantitive only) (Slide 8) Competitive Solicitation & Basis of Award (Design-Build) - correct answer RFP = Best Value of ( Quantitative + Qualitative ) (Slide 9) Point of Contract - correct answer • What constitutes the contract differs significantly • Impacts Roles of the Parties • Impacts who owns the "details" of the Design •Technical Proposal - correct answer Non-price items • Package the Design-Build team prepares for proposal: includes drawings, written specifications, renderings, models and safety plans Price Proposal - correct answer Stipulated Sum proposed based on Technical Proposal Standard Form Design-Build Contracts - correct answer • AIA (American Institute of Architects) • EJCDC (Engineers Joint Contract Document Committee) • AGC (Associated General Contractors Of America) • DBIA (Design-Build Institute of America) Contracts - correct answer Slide: 15 Pricing is not addressed in AIA agreements most significant distinction •Level of design in RFP - correct answer Determines who controls the details of the design Design management - correct answer • If DB entity controls details of design • Price only if DB does not control design Design Draw -Build - correct answer 35% Design or Greater • Typically Low Bid-Based Procurement (price only/no technical) Design Factors (Programming) - correct answer Defined as a written statement of requirements of the building used as the basis for design and the Owner's budget & Schedule (10- 35%) Design Factors (Schematic Design) - correct answer An investigation of different design alternatives that meets the programming statement (10- 35%) Design Factors (Design Development) - correct answer Continuation of the Schematic design stage with design schemes further developed on a system by system basis with more detail Design Factors (Construction Documents) - correct answer Architect creates final working construction documents necessary to bid the job for construction, pull permits and build the job in the field Who Controls the Details of the Design? - correct answer In Design-Bid-Build: the Owner does In Design-Build: The Design-Builder does Owner "Approval" of Design - correct answer Design-Build like putting together a puzzle • The Owner's RFP is like putting together the outside edges of the puzzle • Perimeter will be the same...the "HOW" will be apples and bananas Owner "Approval" of Design - correct answer • Owner approves for "Compliance Only" relative to RFP. • Owner does not approve design details and methods outside the Owner's RFP performance & programming requirements Design/Cost Relationship Design-Bid-Build - correct answer Design is Fixed - Design dictates cost (and performance becomes a variable) (Slide 23)
Written for
- Institution
- DBIA.
- Course
- DBIA.
Document information
- Uploaded on
- May 11, 2024
- Number of pages
- 25
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cmgt 360 final exam 3
Also available in package deal