CSTM 451 Exam #2 Review Exam With All Complete Answers 100% Verified/2024.
T/F According to DBIA, lack of communication is the number one reason why teams fail. - correct answer False The _____ is responsible for choosing a selection panel who help decide which proposer wins the award of the project. - correct answer Owner Under Design-Build, the _______ owns the details of the design. - correct answer Design-Build Entity T/F When us using a Best Value Criteria Matrix, the proposer/design-build entity with the lowest price wins the award. - correct answer False T/F An essential concept of Design-Build is that there are multiple points of responsibility. - correct answer False In determining the selection panel, the ideal size for most projects is _______ people. - correct answer 4-6 What is the distinguishable characteristic between collaboration and integration? - correct answer Integration is blending together into a whole at a common area. Collaboration is working together by inputting individual information. T/F After receiving proposals from shortlisted teams, if the owner has difficulty choosing a design-build team, the owner may request the teams present their best and final proposal. - correct answer True T/F QBS is a two-step process - correct answer False T/F An RFQ should either qualify or disqualify a design-build entity from a job. - correct answer False According to DBIA the communication model includes four parts; Message, Receiver, _________, and Sender - correct answer Feedback T/F An invitation to bid typically includes prescriptive plans ans specs. - correct answer True T/F The organizational structure of the D-B team should be established as soon as the pursuit of a project begins. - correct answer False T/F The owner has the power to influence teaming effectiveness by inserting clauses into the RFP that support integration of team members. - correct answer True True - correct answer T/F The RFP has three functions in a Design-Build setting. They communicate the data and knowledge relevant to the project, establish the owner's role, and clearly state the design-builders role. T/F Design Risk can shift from the owner to the Design-Builder only proportionate to the amount of design furnished by the owner. - correct answer False Uniformat Group A - correct answer Substructure Uniformat Group B - correct answer Shell Uniformat Group C - correct answer Interiors Uniformat Group D - correct answer Services Uniformat Group E - correct answer Equipment & Furnishings Uniformat Group F - correct answer Special Construction & Demolition T/F In order to get the most out of a conceptual cost estimate you must "operationalize" the numbers. - correct answer True T/F According to DBIA, one likely use of bridging documents is for repetitive projects such as fast-food stores. - correct answer True T/F Design Draw-Build is typically low bid based. - correct answer True T/F Case precedence supports Design-Build entities receiving 35% or more of a design in an RFP legally cannot be held liable for the design. - correct answer True T/F Design Build RFPs with 30% plus of the design provided leads to price oriented selections. - correct answer True T/F Under Design Criteria and Preliminary Design DB operational arrangements, the Design-Build functional and performance requirements are the owners responsibility. - correct answer True T/F When a Design-Build proposal comes in it is best to send it off first to the technical evaluation committee. - correct answer True T/F Under DB estimating sequence, the estimate does not grow, it is refined. - correct answer True Co-Location - correct answer Designers and contractors are placed in close proximity to one another. Interdisciplinary Fluency - correct answer Regardless of a team member's discipline, the team can think through a problem by looking at it from multiple perspectives. Design-Build RFP - correct answer Describes the procurement process, forms the basis for final proposals, and becomes and element of the contract. 3 contract documents that initially govern the DB agreement - correct answer RFP, technical proposal, price proposal Design proposals with 35% or less of the design in the RFP will likely be procured through: - correct answer Best Value or QBS Design-Build design and cost relationship - correct answer Design the project to the cost; cost and performance are fixed. Two-Envelope Proposal - correct answer Any selection process in which qualitative proposals are submitted separately from price proposals. Functional Requirement - correct answer Expresses the Owner's needs and the expected operation of the end product. When is the design considered to be committed? - correct answer -The drawings and specs are approved by the DOR as complying with the RFP and has been confirmed that it is within budget.
Written for
- Institution
- DBIA.
- Course
- DBIA.
Document information
- Uploaded on
- May 11, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cstm 451 exam 2 review
Also available in package deal