Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

ITPM Exam Questions And Answers Graded A+

Beoordeling
-
Verkocht
-
Pagina's
11
Cijfer
A+
Geüpload op
12-05-2024
Geschreven in
2023/2024

ITPM Exam Questions And Answers Graded A+ What is a business case, at which stage is it done, what elements does it include? The justification for doing the project What are the stages of Schedule development? Activities from WBS Estimate durations Work out dependencies Develop network diagram Calculate duration, CP, float What is a project Unique process. Coordinated with start and finish dates. It is done to achieve requirements within time, cost and resources. What is the difference between project and Business as usual *Project Roles are assigned High risk Unique Temporary Brings change B-a-U Relies on people knowing roles Lower risk Repetitive Permanent Involves known procedures Does not involve change What is the project environment dependent on? 1. Internal settings (affects the project team) 2. External-to-project (sponsorship, budgets) 3. Industry settings (competitive factors in industry) 4. Macro-external (PESTLE) - National politics, economic factors. Who owns the business case The project sponsor Who creates the business case Sponsor, Project Manager, Customer What does the business case consist of? (Nilesh confirms we need to know them) 1. Description of potential project 2. The reason for it 3. A high level plan 4. Assumptions and Constraints 5. Success criteria

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

ITPM Exam Questions And Answers Graded
A+
What is a business case, at which stage is it done, what elements does it include?
The justification for doing the project


What are the stages of Schedule development?
Activities from WBS
Estimate durations
Work out dependencies
Develop network diagram
Calculate duration, CP, float


What is a project
Unique process. Coordinated with start and finish dates. It is done to achieve requirements within
time, cost and resources.


What is the difference between project and Business as usual
*Project
Roles are assigned
High risk
Unique
Temporary
Brings change

B-a-U
Relies on people knowing roles
Lower risk
Repetitive
Permanent
Involves known procedures
Does not involve change


What is the project environment dependent on?
1. Internal settings (affects the project team)
2. External-to-project (sponsorship, budgets)
3. Industry settings (competitive factors in industry)
4. Macro-external (PESTLE) - National politics, economic factors.


Who owns the business case
The project sponsor


Who creates the business case
Sponsor, Project Manager, Customer


What does the business case consist of? (Nilesh confirms we need to know them)
1. Description of potential project
2. The reason for it
3. A high level plan
4. Assumptions and Constraints

, 5. Success criteria
6. Alternatives and justification why this one
7. High level financial appraisal(assessment)


What is a success criteria?
Implementation of scope within time & budget. It is the metric to evaluate against.

For example, if we take our degree, we have to achieve something. if that is "Pass", this will be the
success criteria which will be measured by calculating our average of grades.


What are the success factors?
The things we need to do to enable success.
(e.g. In our degree: do research, attend classes, work hard).
(e.g. In a group, we are required to follow success factors: Communicating with the rest & etc.)


What are KPIs
KPI = Key Performance Indicators. These are things such as "Earned Value", "Staying on schedule". The
results of these are our KPIs. It can be measured as we go along.

For example, for our degree our average grade will be the Key Performance Indicator.


What is scope?
What the project is going to do & what the project is NOT going to do.


What are the stages of the Project Life-Cycle
1. Initiation Stage
2. Planning/Definition Stage
3. Execution/Development Stage
4. Closure & Handover Stage
*Benefits Realisation
5. Operations (members of the project team will be there to provide assistance and expertise for
further projects that need to be developed to enhance the system)
6. Termination

*Gate Reviews after every stage (Go/No-Go point)


What is Benefits realisation
Benefits Realisation (after Handover & Closeout. We have an extended post-project review to make
sure the anticipated improvements are realised. Whoever has done the project is in the best position
to complete this, ensuring in-depth view of activities. // IT HAS TO BE VALIDATED BY THE SPONSOR)

We will document what was done, how was it done and document it on a "Lessons learned"
document to be used by future projects.


What is the 1. Initiation Stage of the Project Life-Cycle and what are its elements?
Basically, the idea/problem and we are thinking to do a project because we think there is a need.
(The project manager might not be in place yet)
Consists of
Essentially, we are developing the justification for doing the project. (this requires more people and
more cost to do a high level plan)

Geschreven voor

Vak

Documentinformatie

Geüpload op
12 mei 2024
Aantal pagina's
11
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.89
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EXAMSMART Howard Community College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
10
Lid sinds
2 jaar
Aantal volgers
2
Documenten
2992
Laatst verkocht
1 maand geleden
SMART.SCORES

On this page, you find all documents, package deals, and flashcards offered by seller LectJoshua.

5.0

2 beoordelingen

5
2
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen